Worldwide Shipping

We accept online orders and ship globally.

Worldwide Shipping

We accept online orders and ship globally.

Wescon 599 Microstop - M6x1 - 19 mm Cutter Capacity - Straight Skirt

10 DEGREE PIVOTING SHAFT (SWIVEL SHAFT) / HIGH SPEED HEAVY DUTY STAINLESS STEEL
Part NumberWES599-6-S-TF
Measurement Type
Metric
Bearing Rating
10,000 rpm
Bearing Type
Dual Ball Bearings
Heavy Duty Thrust Bearing
Yes
Incremental Adjustment
0.013 mm
Shaft Travel
7.60 mm
Dust Seal
Integrated Dust Seal
Cutter Thread
M6x1
Shaft
Tri-Flat - Pivoting / Swivel Shaft
Shaft Diameter
6.35 mm
Cutter Capacity
19 mm
Skirt
Straight
Skirt Description
25.4 mm OD 19 mm Cutter Capacity
Solid Stop
Yes
Material
Stainless Steel
Country of Origin
USA
* The image represents the general look of the series. Actual product may vary based on options selected.
Stock
: 
Ships in 8 Weeks
  
Login to access real-time inventory.
Price: $605.00
YOUR BUILD
WES599-6-S-TF
$605.00
Stock: Ships in 8 Weeks

CONFIGURE

Your Selected Model:  WES599-6-S-TF

Skirt Style: Straight (S)

Straight

S

Straight

2-Leg

S2L

2-Leg

3-Leg

S3L

3-Leg

Slotted

SL

Slotted

Flanged

F

Flanged

Flanged High

FH

Flanged High

Spherical Flanged

SF

Spherical Flanged

Internal Thread

I

Internal Thread

Slotted Internal Thread

SI

Slotted Internal Thread

External Thread

E

External Thread

Slotted External Thread

SE

Slotted External Thread

Bell

B

Bell

Bell Internal Thread

BI

Bell Internal Thread

Slotted Bell Internal Thread

SBI

Slotted Bell Internal Thread

Bell External Thread

BE

Bell External Thread

Bell Wide External Thread

BWE

Bell Wide External Thread

Slotted Bell External Thread

SBE

Slotted Bell External Thread

Bell Flanged

BF

Bell Flanged

Straight Cutaway

SCA

Straight Cutaway

Flanged Cutaway

FCA

Flanged Cutaway

Flanged 2-Leg

F2L

Flanged 2-Leg

Close Quarters

C

Close Quarters

Straight 0.875 in OD

S-875

Straight 0.875 in OD

Flanged 1.125 in OD

F-1125

Flanged 1.125 in OD

Reduced Diameter Skirt 0.530 in OD

RDS-530

Reduced Diameter Skirt 0.530 in OD

Reduced Diameter Skirt 0.590 in OD

RDS-590

Reduced Diameter Skirt 0.590 in OD

Vacuum Internal Thread

VI

Vacuum Internal Thread

Bell Vacuum Internal Thread

BVI

Bell Vacuum Internal Thread

Bell Vacuum External Thread

BVE

Bell Vacuum External Thread

Foot Style (Available only for Skirts: I, SI, E, SE, BI, SBI, BE, BWE, SBE, VI, BVI, BVE)

N

Nylon

S

Steel

P

Phenolic

Shaft Style: Tri-Flat Swivel Shaft (TF)

Round Swivel Shaft

STANDARD

Round Swivel Shaft

Tri-Flat Swivel Shaft

TF

Tri-Flat Swivel Shaft

Quick Change Swivel Shaft

QC

Quick Change Swivel Shaft

Shaft Thread: M6x1 (6)

STANDARD

1/4-28

6

M6x1

8

M8x1

Also Referred to as

  • 599-6-S-TF
  • Micro-stop 599-6-S-TF
  • Regulador Micrometrico 599-6-S-TF
  • Butee Micrometrique
  • Micro-Stops de avellanado
  • Countersink cage 599-6-S-TF
  • Micro stop drill cage 599-6-S-TF

VARIANTS - WES599 Microstops

Part NumberCutter ThreadCutter CapacityShaft StyleSkirtFootLead Time
WES599-B1/4-287/8 inRound - Pivoting / Swivel ShaftBellShips in 8 Weeks
WES599-BEN1/4-287/8 inRound - Pivoting / Swivel ShaftBell External ThreadNylonShips in 8 Weeks
WES599-BEN-QC1/4-287/8 inQuick Change - Pivoting / Swivel ShaftBell External ThreadNylonShips in 8 Weeks
WES599-BEN-TF1/4-287/8 inTri-Flat - Pivoting / Swivel ShaftBell External ThreadNylonShips in 8 Weeks
WES599-BEP1/4-287/8 inRound - Pivoting / Swivel ShaftBell External ThreadPhenolicShips in 8 Weeks
WES599-BEP-QC1/4-287/8 inQuick Change - Pivoting / Swivel ShaftBell External ThreadPhenolicShips in 8 Weeks
WES599-BEP-TF1/4-287/8 inTri-Flat - Pivoting / Swivel ShaftBell External ThreadPhenolicShips in 8 Weeks
WES599-BES1/4-287/8 inRound - Pivoting / Swivel ShaftBell External ThreadSteelShips in 8 Weeks
WES599-BES-QC1/4-287/8 inQuick Change - Pivoting / Swivel ShaftBell External ThreadSteelShips in 8 Weeks
WES599-BES-TF1/4-287/8 inTri-Flat - Pivoting / Swivel ShaftBell External ThreadSteelShips in 8 Weeks
WES599-BF1/4-287/8 inRound - Pivoting / Swivel ShaftBell FlangedShips in 8 Weeks
WES599-BF-QC1/4-287/8 inQuick Change - Pivoting / Swivel ShaftBell FlangedShips in 8 Weeks
WES599-BF-TF1/4-287/8 inTri-Flat - Pivoting / Swivel ShaftBell FlangedShips in 8 Weeks
WES599-BIN1/4-283/4 inRound - Pivoting / Swivel ShaftBell Internal ThreadNylonShips in 8 Weeks
WES599-BIN-QC1/4-283/4 inQuick Change - Pivoting / Swivel ShaftBell Internal ThreadNylonShips in 8 Weeks
WES599-BIN-TF1/4-283/4 inTri-Flat - Pivoting / Swivel ShaftBell Internal ThreadNylonShips in 8 Weeks
WES599-BIP1/4-283/4 inRound - Pivoting / Swivel ShaftBell Internal ThreadPhenolicShips in 8 Weeks
WES599-BIP-QC1/4-283/4 inQuick Change - Pivoting / Swivel ShaftBell Internal ThreadPhenolicShips in 8 Weeks
WES599-BIP-TF1/4-283/4 inTri-Flat - Pivoting / Swivel ShaftBell Internal ThreadPhenolicShips in 8 Weeks
WES599-BIS1/4-283/4 inRound - Pivoting / Swivel ShaftBell Internal ThreadSteelShips in 8 Weeks
WES599-BIS-QC1/4-283/4 inQuick Change - Pivoting / Swivel ShaftBell Internal ThreadSteelShips in 8 Weeks
WES599-BIS-TF1/4-283/4 inTri-Flat - Pivoting / Swivel ShaftBell Internal ThreadSteelShips in 8 Weeks
WES599-B-QC1/4-287/8 inQuick Change - Pivoting / Swivel ShaftBellShips in 8 Weeks
WES599-B-TF1/4-287/8 inTri-Flat - Pivoting / Swivel ShaftBellShips in 8 Weeks
WES599-BVEN1/4-287/8 inRound - Pivoting / Swivel ShaftBell Vacuum External ThreadNylonShips in 10 Weeks
WES599-BVEN-QC1/4-287/8 inQuick Change - Pivoting / Swivel ShaftBell Vacuum External ThreadNylonShips in 10 Weeks
WES599-BVEN-TF1/4-287/8 inTri-Flat - Pivoting / Swivel ShaftBell Vacuum External ThreadNylonShips in 10 Weeks
WES599-BVEP1/4-287/8 inRound - Pivoting / Swivel ShaftBell Vacuum External ThreadPhenolicShips in 10 Weeks
WES599-BVEP-QC1/4-287/8 inQuick Change - Pivoting / Swivel ShaftBell Vacuum External ThreadPhenolicShips in 10 Weeks
WES599-BVEP-TF1/4-287/8 inTri-Flat - Pivoting / Swivel ShaftBell Vacuum External ThreadPhenolicShips in 10 Weeks
WES599-BVES1/4-287/8 inRound - Pivoting / Swivel ShaftBell Vacuum External ThreadSteelShips in 10 Weeks
WES599-BVES-QC1/4-287/8 inQuick Change - Pivoting / Swivel ShaftBell Vacuum External ThreadSteelShips in 10 Weeks
WES599-BVES-TF1/4-287/8 inTri-Flat - Pivoting / Swivel ShaftBell Vacuum External ThreadSteelShips in 10 Weeks
WES599-BVIN1/4-283/4 inRound - Pivoting / Swivel ShaftBell Vacuum Internal ThreadNylonShips in 10 Weeks
WES599-BVIN-QC1/4-283/4 inQuick Change - Pivoting / Swivel ShaftBell Vacuum Internal ThreadNylonShips in 10 Weeks
WES599-BVIN-TF1/4-283/4 inTri-Flat - Pivoting / Swivel ShaftBell Vacuum Internal ThreadNylonShips in 10 Weeks
WES599-BVIP1/4-283/4 inRound - Pivoting / Swivel ShaftBell Vacuum Internal ThreadPhenolicShips in 10 Weeks
WES599-BVIP-QC1/4-283/4 inQuick Change - Pivoting / Swivel ShaftBell Vacuum Internal ThreadPhenolicShips in 10 Weeks
WES599-BVIP-TF1/4-283/4 inTri-Flat - Pivoting / Swivel ShaftBell Vacuum Internal ThreadPhenolicShips in 10 Weeks
WES599-BVIS1/4-283/4 inRound - Pivoting / Swivel ShaftBell Vacuum Internal ThreadSteelShips in 10 Weeks
WES599-BVIS-QC1/4-283/4 inQuick Change - Pivoting / Swivel ShaftBell Vacuum Internal ThreadSteelShips in 10 Weeks
WES599-BVIS-TF1/4-283/4 inTri-Flat - Pivoting / Swivel ShaftBell Vacuum Internal ThreadSteelShips in 10 Weeks
WES599-BWEN1/4-281 inRound - Pivoting / Swivel ShaftBell Wide External ThreadNylonShips in 12 Weeks
WES599-BWEN-QC1/4-281 inQuick Change - Pivoting / Swivel ShaftBell Wide External ThreadNylonShips in 12 Weeks
WES599-BWEN-TF1/4-281 inTri-Flat - Pivoting / Swivel ShaftBell Wide External ThreadNylonShips in 12 Weeks
WES599-BWEP1/4-281 inRound - Pivoting / Swivel ShaftBell Wide External ThreadPhenolicShips in 12 Weeks
WES599-BWEP-QC1/4-281 inQuick Change - Pivoting / Swivel ShaftBell Wide External ThreadPhenolicShips in 12 Weeks
WES599-BWEP-TF1/4-281 inTri-Flat - Pivoting / Swivel ShaftBell Wide External ThreadPhenolicShips in 12 Weeks
WES599-BWES1/4-281 inRound - Pivoting / Swivel ShaftBell Wide External ThreadSteelShips in 12 Weeks
WES599-BWES-QC1/4-281 inQuick Change - Pivoting / Swivel ShaftBell Wide External ThreadSteelShips in 12 Weeks
WES599-BWES-TF1/4-281 inTri-Flat - Pivoting / Swivel ShaftBell Wide External ThreadSteelShips in 12 Weeks
WES599-C1/4-283/8 inRound - Pivoting / Swivel ShaftClose QuartersShips in 8 Weeks
WES599-C-QC1/4-283/8 inQuick Change - Pivoting / Swivel ShaftClose QuartersShips in 8 Weeks
WES599-C-TF1/4-283/8 inTri-Flat - Pivoting / Swivel ShaftClose QuartersShips in 8 Weeks
WES599-EN1/4-283/4 inRound - Pivoting / Swivel ShaftExternal ThreadNylonShips in 8 Weeks
WES599-EN-QC1/4-283/4 inQuick Change - Pivoting / Swivel ShaftExternal ThreadNylonShips in 8 Weeks
WES599-EN-TF1/4-283/4 inTri-Flat - Pivoting / Swivel ShaftExternal ThreadNylonShips in 8 Weeks
WES599-EP1/4-283/4 inRound - Pivoting / Swivel ShaftExternal ThreadPhenolicShips in 8 Weeks
WES599-EP-QC1/4-283/4 inQuick Change - Pivoting / Swivel ShaftExternal ThreadPhenolicShips in 8 Weeks
WES599-EP-TF1/4-283/4 inTri-Flat - Pivoting / Swivel ShaftExternal ThreadPhenolicShips in 8 Weeks
WES599-ES1/4-283/4 inRound - Pivoting / Swivel ShaftExternal ThreadSteelShips in 8 Weeks
WES599-ES-QC1/4-283/4 inQuick Change - Pivoting / Swivel ShaftExternal ThreadSteelShips in 8 Weeks
WES599-ES-TF1/4-283/4 inTri-Flat - Pivoting / Swivel ShaftExternal ThreadSteelShips in 8 Weeks
WES599-F1/4-283/4 inRound - Pivoting / Swivel ShaftFlangedShips in 8 Weeks
WES599-F-11251/4-283/4 inRound - Pivoting / Swivel ShaftFlanged 1.125 in ODShips in 8 Weeks
WES599-F-1125-QC1/4-283/4 inQuick Change - Pivoting / Swivel ShaftFlanged 1.125 in ODShips in 8 Weeks
WES599-F-1125-TF1/4-283/4 inTri-Flat - Pivoting / Swivel ShaftFlanged 1.125 in ODShips in 8 Weeks
WES599-F2L1/4-283/4 inRound - Pivoting / Swivel ShaftFlanged 2-LegShips in 8 Weeks
WES599-F2L-QC1/4-283/4 inQuick Change - Pivoting / Swivel ShaftFlanged 2-LegShips in 8 Weeks
WES599-F2L-TF1/4-283/4 inTri-Flat - Pivoting / Swivel ShaftFlanged 2-LegShips in 8 Weeks
WES599-FCA1/4-283/4 inRound - Pivoting / Swivel ShaftFlanged CutawayShips in 8 Weeks
WES599-FCA-QC1/4-283/4 inQuick Change - Pivoting / Swivel ShaftFlanged CutawayShips in 8 Weeks
WES599-FCA-TF1/4-283/4 inTri-Flat - Pivoting / Swivel ShaftFlanged CutawayShips in 8 Weeks
WES599-FH1/4-283/4 inRound - Pivoting / Swivel ShaftFlanged HighShips in 8 Weeks
WES599-FH-QC1/4-283/4 inQuick Change - Pivoting / Swivel ShaftFlanged HighShips in 8 Weeks
WES599-FH-TF1/4-283/4 inTri-Flat - Pivoting / Swivel ShaftFlanged HighShips in 8 Weeks
WES599-F-QC1/4-283/4 inQuick Change - Pivoting / Swivel ShaftFlangedShips in 8 Weeks
WES599-F-TF1/4-283/4 inTri-Flat - Pivoting / Swivel ShaftFlangedShips in 8 Weeks
WES599-IN1/4-285/8 inRound - Pivoting / Swivel ShaftInternal ThreadNylonShips in 8 Weeks
WES599-IN-QC1/4-285/8 inQuick Change - Pivoting / Swivel ShaftInternal ThreadNylonShips in 8 Weeks
WES599-IN-TF1/4-285/8 inTri-Flat - Pivoting / Swivel ShaftInternal ThreadNylonShips in 8 Weeks
WES599-IP1/4-285/8 inRound - Pivoting / Swivel ShaftInternal ThreadPhenolicShips in 8 Weeks
WES599-IP-QC1/4-285/8 inQuick Change - Pivoting / Swivel ShaftInternal ThreadPhenolicShips in 8 Weeks
WES599-IP-TF1/4-285/8 inTri-Flat - Pivoting / Swivel ShaftInternal ThreadPhenolicShips in 8 Weeks
WES599-IS1/4-285/8 inRound - Pivoting / Swivel ShaftInternal ThreadSteelShips in 8 Weeks
WES599-IS-QC1/4-285/8 inQuick Change - Pivoting / Swivel ShaftInternal ThreadSteelShips in 8 Weeks
WES599-IS-TF1/4-285/8 inTri-Flat - Pivoting / Swivel ShaftInternal ThreadSteelShips in 8 Weeks
WES599-RDS-5301/4-285/6 inRound - Pivoting / Swivel ShaftReduced Diameter Skirt 0.530 in ODShips in 8 Weeks
WES599-RDS-530-QC1/4-285/6 inQuick Change - Pivoting / Swivel ShaftReduced Diameter Skirt 0.530 in ODShips in 8 Weeks
WES599-RDS-530-TF1/4-285/6 inTri-Flat - Pivoting / Swivel ShaftReduced Diameter Skirt 0.530 in ODShips in 8 Weeks
WES599-RDS-5901/4-283/8 inRound - Pivoting / Swivel ShaftReduced Diameter Skirt 0.590 in ODShips in 8 Weeks
WES599-RDS-590-QC1/4-283/8 inQuick Change - Pivoting / Swivel ShaftReduced Diameter Skirt 0.590 in ODShips in 8 Weeks
WES599-RDS-590-TF1/4-283/8 inTri-Flat - Pivoting / Swivel ShaftReduced Diameter Skirt 0.590 in ODShips in 8 Weeks
WES599-S1/4-283/4 inRound - Pivoting / Swivel ShaftStraightShips in 8 Weeks
WES599-S2L1/4-283/4 inRound - Pivoting / Swivel Shaft2-LegShips in 8 Weeks
WES599-S2L-QC1/4-283/4 inQuick Change - Pivoting / Swivel Shaft2-LegShips in 8 Weeks
WES599-S2L-TF1/4-283/4 inTri-Flat - Pivoting / Swivel Shaft2-LegShips in 8 Weeks
WES599-S3L1/4-283/4 inRound - Pivoting / Swivel Shaft3-LegShips in 8 Weeks
WES599-S3L-QC1/4-283/4 inQuick Change - Pivoting / Swivel Shaft3-LegShips in 8 Weeks
WES599-S3L-TF1/4-283/4 inTri-Flat - Pivoting / Swivel Shaft3-LegShips in 8 Weeks
WES599-S-8751/4-285/8 inRound - Pivoting / Swivel ShaftStraight 0.875 in ODShips in 8 Weeks
WES599-S-875-QC1/4-285/8 inQuick Change - Pivoting / Swivel ShaftStraight 0.875 in ODShips in 8 Weeks
WES599-S-875-TF1/4-285/8 inTri-Flat - Pivoting / Swivel ShaftStraight 0.875 in ODShips in 8 Weeks
WES599-SBEN1/4-287/8 inRound - Pivoting / Swivel ShaftSlotted Bell External ThreadNylonShips in 8 Weeks
WES599-SBEN-QC1/4-287/8 inQuick Change - Pivoting / Swivel ShaftSlotted Bell External ThreadNylonShips in 8 Weeks
WES599-SBEN-TF1/4-287/8 inTri-Flat - Pivoting / Swivel ShaftSlotted Bell External ThreadNylonShips in 8 Weeks
WES599-SBEP1/4-287/8 inRound - Pivoting / Swivel ShaftSlotted Bell External ThreadPhenolicShips in 8 Weeks
WES599-SBEP-QC1/4-287/8 inQuick Change - Pivoting / Swivel ShaftSlotted Bell External ThreadPhenolicShips in 8 Weeks
WES599-SBEP-TF1/4-287/8 inTri-Flat - Pivoting / Swivel ShaftSlotted Bell External ThreadPhenolicShips in 8 Weeks
WES599-SBES1/4-287/8 inRound - Pivoting / Swivel ShaftSlotted Bell External ThreadSteelShips in 8 Weeks
WES599-SBES-QC1/4-287/8 inQuick Change - Pivoting / Swivel ShaftSlotted Bell External ThreadSteelShips in 8 Weeks
WES599-SBES-TF1/4-287/8 inTri-Flat - Pivoting / Swivel ShaftSlotted Bell External ThreadSteelShips in 8 Weeks
WES599-SBIN1/4-283/4 inRound - Pivoting / Swivel ShaftSlotted Bell Internal ThreadNylonShips in 8 Weeks
WES599-SBIN-QC1/4-283/4 inQuick Change - Pivoting / Swivel ShaftSlotted Bell Internal ThreadNylonShips in 8 Weeks
WES599-SBIN-TF1/4-283/4 inTri-Flat - Pivoting / Swivel ShaftSlotted Bell Internal ThreadNylonShips in 8 Weeks
WES599-SBIP1/4-283/4 inRound - Pivoting / Swivel ShaftSlotted Bell Internal ThreadPhenolicShips in 8 Weeks
WES599-SBIP-QC1/4-283/4 inQuick Change - Pivoting / Swivel ShaftSlotted Bell Internal ThreadPhenolicShips in 8 Weeks
WES599-SBIP-TF1/4-283/4 inTri-Flat - Pivoting / Swivel ShaftSlotted Bell Internal ThreadPhenolicShips in 8 Weeks
WES599-SBIS1/4-283/4 inRound - Pivoting / Swivel ShaftSlotted Bell Internal ThreadSteelShips in 8 Weeks
WES599-SBIS-QC1/4-283/4 inQuick Change - Pivoting / Swivel ShaftSlotted Bell Internal ThreadSteelShips in 8 Weeks
WES599-SBIS-TF1/4-283/4 inTri-Flat - Pivoting / Swivel ShaftSlotted Bell Internal ThreadSteelShips in 8 Weeks
WES599-SCA1/4-283/4 inRound - Pivoting / Swivel ShaftStraight CutawayShips in 8 Weeks
WES599-SCA-QC1/4-283/4 inQuick Change - Pivoting / Swivel ShaftStraight CutawayShips in 8 Weeks
WES599-SCA-TF1/4-283/4 inTri-Flat - Pivoting / Swivel ShaftStraight CutawayShips in 8 Weeks
WES599-SEN1/4-283/4 inRound - Pivoting / Swivel ShaftSlotted External ThreadNylonShips in 8 Weeks
WES599-SEN-QC1/4-283/4 inQuick Change - Pivoting / Swivel ShaftSlotted External ThreadNylonShips in 8 Weeks
WES599-SEN-TF1/4-283/4 inTri-Flat - Pivoting / Swivel ShaftSlotted External ThreadNylonShips in 8 Weeks
WES599-SEP1/4-283/4 inRound - Pivoting / Swivel ShaftSlotted External ThreadPhenolicShips in 8 Weeks
WES599-SEP-QC1/4-283/4 inQuick Change - Pivoting / Swivel ShaftSlotted External ThreadPhenolicShips in 8 Weeks
WES599-SEP-TF1/4-283/4 inTri-Flat - Pivoting / Swivel ShaftSlotted External ThreadPhenolicShips in 8 Weeks
WES599-SES1/4-283/4 inRound - Pivoting / Swivel ShaftSlotted External ThreadSteelShips in 8 Weeks
WES599-SES-QC1/4-283/4 inQuick Change - Pivoting / Swivel ShaftSlotted External ThreadSteelShips in 8 Weeks
WES599-SES-TF1/4-283/4 inTri-Flat - Pivoting / Swivel ShaftSlotted External ThreadSteelShips in 8 Weeks
WES599-SF1/4-283/4 inRound - Pivoting / Swivel ShaftSpherical FlangedShips in 8 Weeks
WES599-SF-QC1/4-283/4 inQuick Change - Pivoting / Swivel ShaftSpherical FlangedShips in 8 Weeks
WES599-SF-TF1/4-283/4 inTri-Flat - Pivoting / Swivel ShaftSpherical FlangedShips in 8 Weeks
WES599-SIN1/4-285/8 inRound - Pivoting / Swivel ShaftSlotted Internal ThreadNylonShips in 8 Weeks
WES599-SIN-QC1/4-285/8 inQuick Change - Pivoting / Swivel ShaftSlotted Internal ThreadNylonShips in 8 Weeks
WES599-SIN-TF1/4-285/8 inTri-Flat - Pivoting / Swivel ShaftSlotted Internal ThreadNylonShips in 8 Weeks
WES599-SIP1/4-285/8 inRound - Pivoting / Swivel ShaftSlotted Internal ThreadPhenolicShips in 8 Weeks
WES599-SIP-QC1/4-285/8 inQuick Change - Pivoting / Swivel ShaftSlotted Internal ThreadPhenolicShips in 8 Weeks
WES599-SIP-TF1/4-285/8 inTri-Flat - Pivoting / Swivel ShaftSlotted Internal ThreadPhenolicShips in 8 Weeks
WES599-SIS1/4-285/8 inRound - Pivoting / Swivel ShaftSlotted Internal ThreadSteelShips in 8 Weeks
WES599-SIS-QC1/4-285/8 inQuick Change - Pivoting / Swivel ShaftSlotted Internal ThreadSteelShips in 8 Weeks
WES599-SIS-TF1/4-285/8 inTri-Flat - Pivoting / Swivel ShaftSlotted Internal ThreadSteelShips in 8 Weeks
WES599-SL1/4-283/4 inRound - Pivoting / Swivel ShaftSlottedShips in 8 Weeks
WES599-SL-QC1/4-283/4 inQuick Change - Pivoting / Swivel ShaftSlottedShips in 8 Weeks
WES599-SL-TF1/4-283/4 inTri-Flat - Pivoting / Swivel ShaftSlottedShips in 8 Weeks
WES599-S-QC1/4-283/4 inQuick Change - Pivoting / Swivel ShaftStraightShips in 8 Weeks
WES599-S-TF1/4-283/4 inTri-Flat - Pivoting / Swivel ShaftStraightShips in 8 Weeks
WES599-VIN1/4-285/8 inRound - Pivoting / Swivel ShaftVacuum Internal ThreadNylonShips in 10 Weeks
WES599-VIN-QC1/4-285/8 inQuick Change - Pivoting / Swivel ShaftVacuum Internal ThreadNylonShips in 10 Weeks
WES599-VIN-TF1/4-285/8 inTri-Flat - Pivoting / Swivel ShaftVacuum Internal ThreadNylonShips in 10 Weeks
WES599-VIP1/4-285/8 inRound - Pivoting / Swivel ShaftVacuum Internal ThreadPhenolicShips in 10 Weeks
WES599-VIP-QC1/4-285/8 inQuick Change - Pivoting / Swivel ShaftVacuum Internal ThreadPhenolicShips in 10 Weeks
WES599-VIP-TF1/4-285/8 inTri-Flat - Pivoting / Swivel ShaftVacuum Internal ThreadPhenolicShips in 10 Weeks
WES599-VIS1/4-285/8 inRound - Pivoting / Swivel ShaftVacuum Internal ThreadSteelShips in 10 Weeks
WES599-VIS-QC1/4-285/8 inQuick Change - Pivoting / Swivel ShaftVacuum Internal ThreadSteelShips in 10 Weeks
WES599-VIS-TF1/4-285/8 inTri-Flat - Pivoting / Swivel ShaftVacuum Internal ThreadSteelShips in 10 Weeks
WES599-6-BM6x122 mmRound - Pivoting / Swivel ShaftBellShips in 8 Weeks
WES599-6-BENM6x122 mmRound - Pivoting / Swivel ShaftBell External ThreadNylonShips in 8 Weeks
WES599-6-BEN-QCM6x122 mmQuick Change - Pivoting / Swivel ShaftBell External ThreadNylonShips in 8 Weeks
WES599-6-BEN-TFM6x122 mmTri-Flat - Pivoting / Swivel ShaftBell External ThreadNylonShips in 8 Weeks
WES599-6-BEPM6x122 mmRound - Pivoting / Swivel ShaftBell External ThreadPhenolicShips in 8 Weeks
WES599-6-BEP-QCM6x122 mmQuick Change - Pivoting / Swivel ShaftBell External ThreadPhenolicShips in 8 Weeks
WES599-6-BEP-TFM6x122 mmTri-Flat - Pivoting / Swivel ShaftBell External ThreadPhenolicShips in 8 Weeks
WES599-6-BESM6x122 mmRound - Pivoting / Swivel ShaftBell External ThreadSteelShips in 8 Weeks
WES599-6-BES-QCM6x122 mmQuick Change - Pivoting / Swivel ShaftBell External ThreadSteelShips in 8 Weeks
WES599-6-BES-TFM6x122 mmTri-Flat - Pivoting / Swivel ShaftBell External ThreadSteelShips in 8 Weeks
WES599-6-BFM6x122 mmRound - Pivoting / Swivel ShaftBell FlangedShips in 8 Weeks
WES599-6-BF-QCM6x122 mmQuick Change - Pivoting / Swivel ShaftBell FlangedShips in 8 Weeks
WES599-6-BF-TFM6x122 mmTri-Flat - Pivoting / Swivel ShaftBell FlangedShips in 8 Weeks
WES599-6-BINM6x119 mmRound - Pivoting / Swivel ShaftBell Internal ThreadNylonShips in 8 Weeks
WES599-6-BIN-QCM6x119 mmQuick Change - Pivoting / Swivel ShaftBell Internal ThreadNylonShips in 8 Weeks
WES599-6-BIN-TFM6x119 mmTri-Flat - Pivoting / Swivel ShaftBell Internal ThreadNylonShips in 8 Weeks
WES599-6-BIPM6x119 mmRound - Pivoting / Swivel ShaftBell Internal ThreadPhenolicShips in 8 Weeks
WES599-6-BIP-QCM6x119 mmQuick Change - Pivoting / Swivel ShaftBell Internal ThreadPhenolicShips in 8 Weeks
WES599-6-BIP-TFM6x119 mmTri-Flat - Pivoting / Swivel ShaftBell Internal ThreadPhenolicShips in 8 Weeks
WES599-6-BISM6x119 mmRound - Pivoting / Swivel ShaftBell Internal ThreadSteelShips in 8 Weeks
WES599-6-BIS-QCM6x119 mmQuick Change - Pivoting / Swivel ShaftBell Internal ThreadSteelShips in 8 Weeks
WES599-6-BIS-TFM6x119 mmTri-Flat - Pivoting / Swivel ShaftBell Internal ThreadSteelShips in 8 Weeks
WES599-6-B-QCM6x122 mmQuick Change - Pivoting / Swivel ShaftBellShips in 8 Weeks
WES599-6-B-TFM6x122 mmTri-Flat - Pivoting / Swivel ShaftBellShips in 8 Weeks
WES599-6-BVENM6x122 mmRound - Pivoting / Swivel ShaftBell Vacuum External ThreadNylonShips in 10 Weeks
WES599-6-BVEN-QCM6x122 mmQuick Change - Pivoting / Swivel ShaftBell Vacuum External ThreadNylonShips in 10 Weeks
WES599-6-BVEN-TFM6x122 mmTri-Flat - Pivoting / Swivel ShaftBell Vacuum External ThreadNylonShips in 10 Weeks
WES599-6-BVEPM6x122 mmRound - Pivoting / Swivel ShaftBell Vacuum External ThreadPhenolicShips in 10 Weeks
WES599-6-BVEP-QCM6x122 mmQuick Change - Pivoting / Swivel ShaftBell Vacuum External ThreadPhenolicShips in 10 Weeks
WES599-6-BVEP-TFM6x122 mmTri-Flat - Pivoting / Swivel ShaftBell Vacuum External ThreadPhenolicShips in 10 Weeks
WES599-6-BVESM6x122 mmRound - Pivoting / Swivel ShaftBell Vacuum External ThreadSteelShips in 10 Weeks
WES599-6-BVES-QCM6x122 mmQuick Change - Pivoting / Swivel ShaftBell Vacuum External ThreadSteelShips in 10 Weeks
WES599-6-BVES-TFM6x122 mmTri-Flat - Pivoting / Swivel ShaftBell Vacuum External ThreadSteelShips in 10 Weeks
WES599-6-BVINM6x119 mmRound - Pivoting / Swivel ShaftBell Vacuum Internal ThreadNylonShips in 10 Weeks
WES599-6-BVIN-QCM6x119 mmQuick Change - Pivoting / Swivel ShaftBell Vacuum Internal ThreadNylonShips in 10 Weeks
WES599-6-BVIN-TFM6x119 mmTri-Flat - Pivoting / Swivel ShaftBell Vacuum Internal ThreadNylonShips in 10 Weeks
WES599-6-BVIPM6x119 mmRound - Pivoting / Swivel ShaftBell Vacuum Internal ThreadPhenolicShips in 10 Weeks
WES599-6-BVIP-QCM6x119 mmQuick Change - Pivoting / Swivel ShaftBell Vacuum Internal ThreadPhenolicShips in 10 Weeks
WES599-6-BVIP-TFM6x119 mmTri-Flat - Pivoting / Swivel ShaftBell Vacuum Internal ThreadPhenolicShips in 10 Weeks
WES599-6-BVISM6x119 mmRound - Pivoting / Swivel ShaftBell Vacuum Internal ThreadSteelShips in 10 Weeks
WES599-6-BVIS-QCM6x119 mmQuick Change - Pivoting / Swivel ShaftBell Vacuum Internal ThreadSteelShips in 10 Weeks
WES599-6-BVIS-TFM6x119 mmTri-Flat - Pivoting / Swivel ShaftBell Vacuum Internal ThreadSteelShips in 10 Weeks
WES599-6-BWENM6x125.4 mmRound - Pivoting / Swivel ShaftBell Wide External ThreadNylonShips in 12 Weeks
WES599-6-BWEN-QCM6x125.4 mmQuick Change - Pivoting / Swivel ShaftBell Wide External ThreadNylonShips in 12 Weeks
WES599-6-BWEN-TFM6x125.4 mmTri-Flat - Pivoting / Swivel ShaftBell Wide External ThreadNylonShips in 12 Weeks
WES599-6-BWEPM6x125.4 mmRound - Pivoting / Swivel ShaftBell Wide External ThreadPhenolicShips in 12 Weeks
WES599-6-BWEP-QCM6x125.4 mmQuick Change - Pivoting / Swivel ShaftBell Wide External ThreadPhenolicShips in 12 Weeks
WES599-6-BWEP-TFM6x125.4 mmTri-Flat - Pivoting / Swivel ShaftBell Wide External ThreadPhenolicShips in 12 Weeks
WES599-6-BWESM6x125.4 mmRound - Pivoting / Swivel ShaftBell Wide External ThreadSteelShips in 12 Weeks
WES599-6-BWES-QCM6x125.4 mmQuick Change - Pivoting / Swivel ShaftBell Wide External ThreadSteelShips in 12 Weeks
WES599-6-BWES-TFM6x125.4 mmTri-Flat - Pivoting / Swivel ShaftBell Wide External ThreadSteelShips in 12 Weeks
WES599-6-CM6x19.52 mmRound - Pivoting / Swivel ShaftClose QuartersShips in 8 Weeks
WES599-6-C-QCM6x19.52 mmQuick Change - Pivoting / Swivel ShaftClose QuartersShips in 8 Weeks
WES599-6-C-TFM6x19.52 mmTri-Flat - Pivoting / Swivel ShaftClose QuartersShips in 8 Weeks
WES599-6-ENM6x119 mmRound - Pivoting / Swivel ShaftExternal ThreadNylonShips in 8 Weeks
WES599-6-EN-QCM6x119 mmQuick Change - Pivoting / Swivel ShaftExternal ThreadNylonShips in 8 Weeks
WES599-6-EN-TFM6x119 mmTri-Flat - Pivoting / Swivel ShaftExternal ThreadNylonShips in 8 Weeks
WES599-6-EPM6x119 mmRound - Pivoting / Swivel ShaftExternal ThreadPhenolicShips in 8 Weeks
WES599-6-EP-QCM6x119 mmQuick Change - Pivoting / Swivel ShaftExternal ThreadPhenolicShips in 8 Weeks
WES599-6-EP-TFM6x119 mmTri-Flat - Pivoting / Swivel ShaftExternal ThreadPhenolicShips in 8 Weeks
WES599-6-ESM6x119 mmRound - Pivoting / Swivel ShaftExternal ThreadSteelShips in 8 Weeks
WES599-6-ES-QCM6x119 mmQuick Change - Pivoting / Swivel ShaftExternal ThreadSteelShips in 8 Weeks
WES599-6-ES-TFM6x119 mmTri-Flat - Pivoting / Swivel ShaftExternal ThreadSteelShips in 8 Weeks
WES599-6-FM6x119 mmRound - Pivoting / Swivel ShaftFlangedShips in 8 Weeks
WES599-6-F-1125M6x119 mmRound - Pivoting / Swivel ShaftFlanged 1.125 in ODShips in 8 Weeks
WES599-6-F-1125-QCM6x119 mmQuick Change - Pivoting / Swivel ShaftFlanged 1.125 in ODShips in 8 Weeks
WES599-6-F-1125-TFM6x119 mmTri-Flat - Pivoting / Swivel ShaftFlanged 1.125 in ODShips in 8 Weeks
WES599-6-F2LM6x119 mmRound - Pivoting / Swivel ShaftFlanged 2-LegShips in 8 Weeks
WES599-6-F2L-QCM6x119 mmQuick Change - Pivoting / Swivel ShaftFlanged 2-LegShips in 8 Weeks
WES599-6-F2L-TFM6x119 mmTri-Flat - Pivoting / Swivel ShaftFlanged 2-LegShips in 8 Weeks
WES599-6-FCAM6x119 mmRound - Pivoting / Swivel ShaftFlanged CutawayShips in 8 Weeks
WES599-6-FCA-QCM6x119 mmQuick Change - Pivoting / Swivel ShaftFlanged CutawayShips in 8 Weeks
WES599-6-FCA-TFM6x119 mmTri-Flat - Pivoting / Swivel ShaftFlanged CutawayShips in 8 Weeks
WES599-6-FHM6x119 mmRound - Pivoting / Swivel ShaftFlanged HighShips in 8 Weeks
WES599-6-FH-QCM6x119 mmQuick Change - Pivoting / Swivel ShaftFlanged HighShips in 8 Weeks
WES599-6-FH-TFM6x119 mmTri-Flat - Pivoting / Swivel ShaftFlanged HighShips in 8 Weeks
WES599-6-F-QCM6x119 mmQuick Change - Pivoting / Swivel ShaftFlangedShips in 8 Weeks
WES599-6-F-TFM6x119 mmTri-Flat - Pivoting / Swivel ShaftFlangedShips in 8 Weeks
WES599-6-INM6x115 mmRound - Pivoting / Swivel ShaftInternal ThreadNylonShips in 8 Weeks
WES599-6-IN-QCM6x115 mmQuick Change - Pivoting / Swivel ShaftInternal ThreadNylonShips in 8 Weeks
WES599-6-IN-TFM6x115 mmTri-Flat - Pivoting / Swivel ShaftInternal ThreadNylonShips in 8 Weeks
WES599-6-IPM6x115 mmRound - Pivoting / Swivel ShaftInternal ThreadPhenolicShips in 8 Weeks
WES599-6-IP-QCM6x115 mmQuick Change - Pivoting / Swivel ShaftInternal ThreadPhenolicShips in 8 Weeks
WES599-6-IP-TFM6x115 mmTri-Flat - Pivoting / Swivel ShaftInternal ThreadPhenolicShips in 8 Weeks
WES599-6-ISM6x115 mmRound - Pivoting / Swivel ShaftInternal ThreadSteelShips in 8 Weeks
WES599-6-IS-QCM6x115 mmQuick Change - Pivoting / Swivel ShaftInternal ThreadSteelShips in 8 Weeks
WES599-6-IS-TFM6x115 mmTri-Flat - Pivoting / Swivel ShaftInternal ThreadSteelShips in 8 Weeks
WES599-6-RDS-530M6x17.94 mmRound - Pivoting / Swivel ShaftReduced Diameter Skirt 0.530 in ODShips in 8 Weeks
WES599-6-RDS-530-QCM6x17.94 mmQuick Change - Pivoting / Swivel ShaftReduced Diameter Skirt 0.530 in ODShips in 8 Weeks
WES599-6-RDS-530-TFM6x17.94 mmTri-Flat - Pivoting / Swivel ShaftReduced Diameter Skirt 0.530 in ODShips in 8 Weeks
WES599-6-RDS-590M6x19.52 mmRound - Pivoting / Swivel ShaftReduced Diameter Skirt 0.590 in ODShips in 8 Weeks
WES599-6-RDS-590-QCM6x19.52 mmQuick Change - Pivoting / Swivel ShaftReduced Diameter Skirt 0.590 in ODShips in 8 Weeks
WES599-6-RDS-590-TFM6x19.52 mmTri-Flat - Pivoting / Swivel ShaftReduced Diameter Skirt 0.590 in ODShips in 8 Weeks
WES599-6-SM6x119 mmRound - Pivoting / Swivel ShaftStraightShips in 8 Weeks
WES599-6-S2LM6x119 mmRound - Pivoting / Swivel Shaft2-LegShips in 8 Weeks
WES599-6-S2L-QCM6x119 mmQuick Change - Pivoting / Swivel Shaft2-LegShips in 8 Weeks
WES599-6-S2L-TFM6x119 mmTri-Flat - Pivoting / Swivel Shaft2-LegShips in 8 Weeks
WES599-6-S3LM6x119 mmRound - Pivoting / Swivel Shaft3-LegShips in 8 Weeks
WES599-6-S3L-QCM6x119 mmQuick Change - Pivoting / Swivel Shaft3-LegShips in 8 Weeks
WES599-6-S3L-TFM6x119 mmTri-Flat - Pivoting / Swivel Shaft3-LegShips in 8 Weeks
WES599-6-S-875M6x115.88 mmRound - Pivoting / Swivel ShaftStraight 0.875 in ODShips in 8 Weeks
WES599-6-S-875-QCM6x115.88 mmQuick Change - Pivoting / Swivel ShaftStraight 0.875 in ODShips in 8 Weeks
WES599-6-S-875-TFM6x115.88 mmTri-Flat - Pivoting / Swivel ShaftStraight 0.875 in ODShips in 8 Weeks
WES599-6-SBENM6x122 mmRound - Pivoting / Swivel ShaftSlotted Bell External ThreadNylonShips in 8 Weeks
WES599-6-SBEN-QCM6x122 mmQuick Change - Pivoting / Swivel ShaftSlotted Bell External ThreadNylonShips in 8 Weeks
WES599-6-SBEN-TFM6x122 mmTri-Flat - Pivoting / Swivel ShaftSlotted Bell External ThreadNylonShips in 8 Weeks
WES599-6-SBEPM6x122 mmRound - Pivoting / Swivel ShaftSlotted Bell External ThreadPhenolicShips in 8 Weeks
WES599-6-SBEP-QCM6x122 mmQuick Change - Pivoting / Swivel ShaftSlotted Bell External ThreadPhenolicShips in 8 Weeks
WES599-6-SBEP-TFM6x122 mmTri-Flat - Pivoting / Swivel ShaftSlotted Bell External ThreadPhenolicShips in 8 Weeks
WES599-6-SBESM6x122 mmRound - Pivoting / Swivel ShaftSlotted Bell External ThreadSteelShips in 8 Weeks
WES599-6-SBES-QCM6x122 mmQuick Change - Pivoting / Swivel ShaftSlotted Bell External ThreadSteelShips in 8 Weeks
WES599-6-SBES-TFM6x122 mmTri-Flat - Pivoting / Swivel ShaftSlotted Bell External ThreadSteelShips in 8 Weeks
WES599-6-SBINM6x119 mmRound - Pivoting / Swivel ShaftSlotted Bell Internal ThreadNylonShips in 8 Weeks
WES599-6-SBIN-QCM6x119 mmQuick Change - Pivoting / Swivel ShaftSlotted Bell Internal ThreadNylonShips in 8 Weeks
WES599-6-SBIN-TFM6x119 mmTri-Flat - Pivoting / Swivel ShaftSlotted Bell Internal ThreadNylonShips in 8 Weeks
WES599-6-SBIPM6x119 mmRound - Pivoting / Swivel ShaftSlotted Bell Internal ThreadPhenolicShips in 8 Weeks
WES599-6-SBIP-QCM6x119 mmQuick Change - Pivoting / Swivel ShaftSlotted Bell Internal ThreadPhenolicShips in 8 Weeks
WES599-6-SBIP-TFM6x119 mmTri-Flat - Pivoting / Swivel ShaftSlotted Bell Internal ThreadPhenolicShips in 8 Weeks
WES599-6-SBISM6x119 mmRound - Pivoting / Swivel ShaftSlotted Bell Internal ThreadSteelShips in 8 Weeks
WES599-6-SBIS-QCM6x119 mmQuick Change - Pivoting / Swivel ShaftSlotted Bell Internal ThreadSteelShips in 8 Weeks
WES599-6-SBIS-TFM6x119 mmTri-Flat - Pivoting / Swivel ShaftSlotted Bell Internal ThreadSteelShips in 8 Weeks
WES599-6-SCAM6x119 mmRound - Pivoting / Swivel ShaftStraight CutawayShips in 8 Weeks
WES599-6-SCA-QCM6x119 mmQuick Change - Pivoting / Swivel ShaftStraight CutawayShips in 8 Weeks
WES599-6-SCA-TFM6x119 mmTri-Flat - Pivoting / Swivel ShaftStraight CutawayShips in 8 Weeks
WES599-6-SENM6x119 mmRound - Pivoting / Swivel ShaftSlotted External ThreadNylonShips in 8 Weeks
WES599-6-SEN-QCM6x119 mmQuick Change - Pivoting / Swivel ShaftSlotted External ThreadNylonShips in 8 Weeks
WES599-6-SEN-TFM6x119 mmTri-Flat - Pivoting / Swivel ShaftSlotted External ThreadNylonShips in 8 Weeks
WES599-6-SEPM6x119 mmRound - Pivoting / Swivel ShaftSlotted External ThreadPhenolicShips in 8 Weeks
WES599-6-SEP-QCM6x119 mmQuick Change - Pivoting / Swivel ShaftSlotted External ThreadPhenolicShips in 8 Weeks
WES599-6-SEP-TFM6x119 mmTri-Flat - Pivoting / Swivel ShaftSlotted External ThreadPhenolicShips in 8 Weeks
WES599-6-SESM6x119 mmRound - Pivoting / Swivel ShaftSlotted External ThreadSteelShips in 8 Weeks
WES599-6-SES-QCM6x119 mmQuick Change - Pivoting / Swivel ShaftSlotted External ThreadSteelShips in 8 Weeks
WES599-6-SES-TFM6x119 mmTri-Flat - Pivoting / Swivel ShaftSlotted External ThreadSteelShips in 8 Weeks
WES599-6-SFM6x119 mmRound - Pivoting / Swivel ShaftSpherical FlangedShips in 8 Weeks
WES599-6-SF-QCM6x119 mmQuick Change - Pivoting / Swivel ShaftSpherical FlangedShips in 8 Weeks
WES599-6-SF-TFM6x119 mmTri-Flat - Pivoting / Swivel ShaftSpherical FlangedShips in 8 Weeks
WES599-6-SINM6x115 mmRound - Pivoting / Swivel ShaftSlotted Internal ThreadNylonShips in 8 Weeks
WES599-6-SIN-QCM6x115 mmQuick Change - Pivoting / Swivel ShaftSlotted Internal ThreadNylonShips in 8 Weeks
WES599-6-SIN-TFM6x115 mmTri-Flat - Pivoting / Swivel ShaftSlotted Internal ThreadNylonShips in 8 Weeks
WES599-6-SIPM6x115 mmRound - Pivoting / Swivel ShaftSlotted Internal ThreadPhenolicShips in 8 Weeks
WES599-6-SIP-QCM6x115 mmQuick Change - Pivoting / Swivel ShaftSlotted Internal ThreadPhenolicShips in 8 Weeks
WES599-6-SIP-TFM6x115 mmTri-Flat - Pivoting / Swivel ShaftSlotted Internal ThreadPhenolicShips in 8 Weeks
WES599-6-SISM6x115 mmRound - Pivoting / Swivel ShaftSlotted Internal ThreadSteelShips in 8 Weeks
WES599-6-SIS-QCM6x115 mmQuick Change - Pivoting / Swivel ShaftSlotted Internal ThreadSteelShips in 8 Weeks
WES599-6-SIS-TFM6x115 mmTri-Flat - Pivoting / Swivel ShaftSlotted Internal ThreadSteelShips in 8 Weeks
WES599-6-SLM6x119 mmRound - Pivoting / Swivel ShaftSlottedShips in 8 Weeks
WES599-6-SL-QCM6x119 mmQuick Change - Pivoting / Swivel ShaftSlottedShips in 8 Weeks
WES599-6-SL-TFM6x119 mmTri-Flat - Pivoting / Swivel ShaftSlottedShips in 8 Weeks
WES599-6-S-QCM6x119 mmQuick Change - Pivoting / Swivel ShaftStraightShips in 8 Weeks
WES599-6-S-TFM6x119 mmTri-Flat - Pivoting / Swivel ShaftStraightShips in 8 Weeks
WES599-6-VINM6x115 mmRound - Pivoting / Swivel ShaftVacuum Internal ThreadNylonShips in 10 Weeks
WES599-6-VIN-QCM6x115 mmQuick Change - Pivoting / Swivel ShaftVacuum Internal ThreadNylonShips in 10 Weeks
WES599-6-VIN-TFM6x115 mmTri-Flat - Pivoting / Swivel ShaftVacuum Internal ThreadNylonShips in 10 Weeks
WES599-6-VIPM6x115 mmRound - Pivoting / Swivel ShaftVacuum Internal ThreadPhenolicShips in 10 Weeks
WES599-6-VIP-QCM6x115 mmQuick Change - Pivoting / Swivel ShaftVacuum Internal ThreadPhenolicShips in 10 Weeks
WES599-6-VIP-TFM6x115 mmTri-Flat - Pivoting / Swivel ShaftVacuum Internal ThreadPhenolicShips in 10 Weeks
WES599-6-VISM6x115 mmRound - Pivoting / Swivel ShaftVacuum Internal ThreadSteelShips in 10 Weeks
WES599-6-VIS-QCM6x115 mmQuick Change - Pivoting / Swivel ShaftVacuum Internal ThreadSteelShips in 10 Weeks
WES599-6-VIS-TFM6x115 mmTri-Flat - Pivoting / Swivel ShaftVacuum Internal ThreadSteelShips in 10 Weeks
WES599-8-BM8x122 mmRound - Pivoting / Swivel ShaftBellShips in 8 Weeks
WES599-8-BENM8x122 mmRound - Pivoting / Swivel ShaftBell External ThreadNylonShips in 8 Weeks
WES599-8-BEN-QCM8x122 mmQuick Change - Pivoting / Swivel ShaftBell External ThreadNylonShips in 8 Weeks
WES599-8-BEN-TFM8x122 mmTri-Flat - Pivoting / Swivel ShaftBell External ThreadNylonShips in 8 Weeks
WES599-8-BEPM8x122 mmRound - Pivoting / Swivel ShaftBell External ThreadPhenolicShips in 8 Weeks
WES599-8-BEP-QCM8x122 mmQuick Change - Pivoting / Swivel ShaftBell External ThreadPhenolicShips in 8 Weeks
WES599-8-BEP-TFM8x122 mmTri-Flat - Pivoting / Swivel ShaftBell External ThreadPhenolicShips in 8 Weeks
WES599-8-BESM8x122 mmRound - Pivoting / Swivel ShaftBell External ThreadSteelShips in 8 Weeks
WES599-8-BES-QCM8x122 mmQuick Change - Pivoting / Swivel ShaftBell External ThreadSteelShips in 8 Weeks
WES599-8-BES-TFM8x122 mmTri-Flat - Pivoting / Swivel ShaftBell External ThreadSteelShips in 8 Weeks
WES599-8-BFM8x122 mmRound - Pivoting / Swivel ShaftBell FlangedShips in 8 Weeks
WES599-8-BF-QCM8x122 mmQuick Change - Pivoting / Swivel ShaftBell FlangedShips in 8 Weeks
WES599-8-BF-TFM8x122 mmTri-Flat - Pivoting / Swivel ShaftBell FlangedShips in 8 Weeks
WES599-8-BINM8x119 mmRound - Pivoting / Swivel ShaftBell Internal ThreadNylonShips in 8 Weeks
WES599-8-BIN-QCM8x119 mmQuick Change - Pivoting / Swivel ShaftBell Internal ThreadNylonShips in 8 Weeks
WES599-8-BIN-TFM8x119 mmTri-Flat - Pivoting / Swivel ShaftBell Internal ThreadNylonShips in 8 Weeks
WES599-8-BIPM8x119 mmRound - Pivoting / Swivel ShaftBell Internal ThreadPhenolicShips in 8 Weeks
WES599-8-BIP-QCM8x119 mmQuick Change - Pivoting / Swivel ShaftBell Internal ThreadPhenolicShips in 8 Weeks
WES599-8-BIP-TFM8x119 mmTri-Flat - Pivoting / Swivel ShaftBell Internal ThreadPhenolicShips in 8 Weeks
WES599-8-BISM8x119 mmRound - Pivoting / Swivel ShaftBell Internal ThreadSteelShips in 8 Weeks
WES599-8-BIS-QCM8x119 mmQuick Change - Pivoting / Swivel ShaftBell Internal ThreadSteelShips in 8 Weeks
WES599-8-BIS-TFM8x119 mmTri-Flat - Pivoting / Swivel ShaftBell Internal ThreadSteelShips in 8 Weeks
WES599-8-B-QCM8x122 mmQuick Change - Pivoting / Swivel ShaftBellShips in 8 Weeks
WES599-8-B-TFM8x122 mmTri-Flat - Pivoting / Swivel ShaftBellShips in 8 Weeks
WES599-8-BVENM8x122 mmRound - Pivoting / Swivel ShaftBell Vacuum External ThreadNylonShips in 10 Weeks
WES599-8-BVEN-QCM8x122 mmQuick Change - Pivoting / Swivel ShaftBell Vacuum External ThreadNylonShips in 10 Weeks
WES599-8-BVEN-TFM8x122 mmTri-Flat - Pivoting / Swivel ShaftBell Vacuum External ThreadNylonShips in 10 Weeks
WES599-8-BVEPM8x122 mmRound - Pivoting / Swivel ShaftBell Vacuum External ThreadPhenolicShips in 10 Weeks
WES599-8-BVEP-QCM8x122 mmQuick Change - Pivoting / Swivel ShaftBell Vacuum External ThreadPhenolicShips in 10 Weeks
WES599-8-BVEP-TFM8x122 mmTri-Flat - Pivoting / Swivel ShaftBell Vacuum External ThreadPhenolicShips in 10 Weeks
WES599-8-BVESM8x122 mmRound - Pivoting / Swivel ShaftBell Vacuum External ThreadSteelShips in 10 Weeks
WES599-8-BVES-QCM8x122 mmQuick Change - Pivoting / Swivel ShaftBell Vacuum External ThreadSteelShips in 10 Weeks
WES599-8-BVES-TFM8x122 mmTri-Flat - Pivoting / Swivel ShaftBell Vacuum External ThreadSteelShips in 10 Weeks
WES599-8-BVINM8x119 mmRound - Pivoting / Swivel ShaftBell Vacuum Internal ThreadNylonShips in 10 Weeks
WES599-8-BVIN-QCM8x119 mmQuick Change - Pivoting / Swivel ShaftBell Vacuum Internal ThreadNylonShips in 10 Weeks
WES599-8-BVIN-TFM8x119 mmTri-Flat - Pivoting / Swivel ShaftBell Vacuum Internal ThreadNylonShips in 10 Weeks
WES599-8-BVIPM8x119 mmRound - Pivoting / Swivel ShaftBell Vacuum Internal ThreadPhenolicShips in 10 Weeks
WES599-8-BVIP-QCM8x119 mmQuick Change - Pivoting / Swivel ShaftBell Vacuum Internal ThreadPhenolicShips in 10 Weeks
WES599-8-BVIP-TFM8x119 mmTri-Flat - Pivoting / Swivel ShaftBell Vacuum Internal ThreadPhenolicShips in 10 Weeks
WES599-8-BVISM8x119 mmRound - Pivoting / Swivel ShaftBell Vacuum Internal ThreadSteelShips in 10 Weeks
WES599-8-BVIS-QCM8x119 mmQuick Change - Pivoting / Swivel ShaftBell Vacuum Internal ThreadSteelShips in 10 Weeks
WES599-8-BVIS-TFM8x119 mmTri-Flat - Pivoting / Swivel ShaftBell Vacuum Internal ThreadSteelShips in 10 Weeks
WES599-8-BWENM8x125.4 mmRound - Pivoting / Swivel ShaftBell Wide External ThreadNylonShips in 12 Weeks
WES599-8-BWEN-QCM8x125.4 mmQuick Change - Pivoting / Swivel ShaftBell Wide External ThreadNylonShips in 12 Weeks
WES599-8-BWEN-TFM8x125.4 mmTri-Flat - Pivoting / Swivel ShaftBell Wide External ThreadNylonShips in 12 Weeks
WES599-8-BWEPM8x125.4 mmRound - Pivoting / Swivel ShaftBell Wide External ThreadPhenolicShips in 12 Weeks
WES599-8-BWEP-QCM8x125.4 mmQuick Change - Pivoting / Swivel ShaftBell Wide External ThreadPhenolicShips in 12 Weeks
WES599-8-BWEP-TFM8x125.4 mmTri-Flat - Pivoting / Swivel ShaftBell Wide External ThreadPhenolicShips in 12 Weeks
WES599-8-BWESM8x125.4 mmRound - Pivoting / Swivel ShaftBell Wide External ThreadSteelShips in 12 Weeks
WES599-8-BWES-QCM8x125.4 mmQuick Change - Pivoting / Swivel ShaftBell Wide External ThreadSteelShips in 12 Weeks
WES599-8-BWES-TFM8x125.4 mmTri-Flat - Pivoting / Swivel ShaftBell Wide External ThreadSteelShips in 12 Weeks
WES599-8-CM8x19.52 mmRound - Pivoting / Swivel ShaftClose QuartersShips in 8 Weeks
WES599-8-C-QCM8x19.52 mmQuick Change - Pivoting / Swivel ShaftClose QuartersShips in 8 Weeks
WES599-8-C-TFM8x19.52 mmTri-Flat - Pivoting / Swivel ShaftClose QuartersShips in 8 Weeks
WES599-8-ENM8x119 mmRound - Pivoting / Swivel ShaftExternal ThreadNylonShips in 8 Weeks
WES599-8-EN-QCM8x119 mmQuick Change - Pivoting / Swivel ShaftExternal ThreadNylonShips in 8 Weeks
WES599-8-EN-TFM8x119 mmTri-Flat - Pivoting / Swivel ShaftExternal ThreadNylonShips in 8 Weeks
WES599-8-EPM8x119 mmRound - Pivoting / Swivel ShaftExternal ThreadPhenolicShips in 8 Weeks
WES599-8-EP-QCM8x119 mmQuick Change - Pivoting / Swivel ShaftExternal ThreadPhenolicShips in 8 Weeks
WES599-8-EP-TFM8x119 mmTri-Flat - Pivoting / Swivel ShaftExternal ThreadPhenolicShips in 8 Weeks
WES599-8-ESM8x119 mmRound - Pivoting / Swivel ShaftExternal ThreadSteelShips in 8 Weeks
WES599-8-ES-QCM8x119 mmQuick Change - Pivoting / Swivel ShaftExternal ThreadSteelShips in 8 Weeks
WES599-8-ES-TFM8x119 mmTri-Flat - Pivoting / Swivel ShaftExternal ThreadSteelShips in 8 Weeks
WES599-8-FM8x119 mmRound - Pivoting / Swivel ShaftFlangedShips in 8 Weeks
WES599-8-F-1125M8x119 mmRound - Pivoting / Swivel ShaftFlanged 1.125 in ODShips in 8 Weeks
WES599-8-F-1125-QCM8x119 mmQuick Change - Pivoting / Swivel ShaftFlanged 1.125 in ODShips in 8 Weeks
WES599-8-F-1125-TFM8x119 mmTri-Flat - Pivoting / Swivel ShaftFlanged 1.125 in ODShips in 8 Weeks
WES599-8-F2LM8x119 mmRound - Pivoting / Swivel ShaftFlanged 2-LegShips in 8 Weeks
WES599-8-F2L-QCM8x119 mmQuick Change - Pivoting / Swivel ShaftFlanged 2-LegShips in 8 Weeks
WES599-8-F2L-TFM8x119 mmTri-Flat - Pivoting / Swivel ShaftFlanged 2-LegShips in 8 Weeks
WES599-8-FCAM8x119 mmRound - Pivoting / Swivel ShaftFlanged CutawayShips in 8 Weeks
WES599-8-FCA-QCM8x119 mmQuick Change - Pivoting / Swivel ShaftFlanged CutawayShips in 8 Weeks
WES599-8-FCA-TFM8x119 mmTri-Flat - Pivoting / Swivel ShaftFlanged CutawayShips in 8 Weeks
WES599-8-FHM8x119 mmRound - Pivoting / Swivel ShaftFlanged HighShips in 8 Weeks
WES599-8-FH-QCM8x119 mmQuick Change - Pivoting / Swivel ShaftFlanged HighShips in 8 Weeks
WES599-8-FH-TFM8x119 mmTri-Flat - Pivoting / Swivel ShaftFlanged HighShips in 8 Weeks
WES599-8-F-QCM8x119 mmQuick Change - Pivoting / Swivel ShaftFlangedShips in 8 Weeks
WES599-8-F-TFM8x119 mmTri-Flat - Pivoting / Swivel ShaftFlangedShips in 8 Weeks
WES599-8-INM8x115 mmRound - Pivoting / Swivel ShaftInternal ThreadNylonShips in 8 Weeks
WES599-8-IN-QCM8x115 mmQuick Change - Pivoting / Swivel ShaftInternal ThreadNylonShips in 8 Weeks
WES599-8-IN-TFM8x115 mmTri-Flat - Pivoting / Swivel ShaftInternal ThreadNylonShips in 8 Weeks
WES599-8-IPM8x115 mmRound - Pivoting / Swivel ShaftInternal ThreadPhenolicShips in 8 Weeks
WES599-8-IP-QCM8x115 mmQuick Change - Pivoting / Swivel ShaftInternal ThreadPhenolicShips in 8 Weeks
WES599-8-IP-TFM8x115 mmTri-Flat - Pivoting / Swivel ShaftInternal ThreadPhenolicShips in 8 Weeks
WES599-8-ISM8x115 mmRound - Pivoting / Swivel ShaftInternal ThreadSteelShips in 8 Weeks
WES599-8-IS-QCM8x115 mmQuick Change - Pivoting / Swivel ShaftInternal ThreadSteelShips in 8 Weeks
WES599-8-IS-TFM8x115 mmTri-Flat - Pivoting / Swivel ShaftInternal ThreadSteelShips in 8 Weeks
WES599-8-RDS-530M8x17.94 mmRound - Pivoting / Swivel ShaftReduced Diameter Skirt 0.530 in ODShips in 8 Weeks
WES599-8-RDS-530-QCM8x17.94 mmQuick Change - Pivoting / Swivel ShaftReduced Diameter Skirt 0.530 in ODShips in 8 Weeks
WES599-8-RDS-530-TFM8x17.94 mmTri-Flat - Pivoting / Swivel ShaftReduced Diameter Skirt 0.530 in ODShips in 8 Weeks
WES599-8-RDS-590M8x19.52 mmRound - Pivoting / Swivel ShaftReduced Diameter Skirt 0.590 in ODShips in 8 Weeks
WES599-8-RDS-590-QCM8x19.52 mmQuick Change - Pivoting / Swivel ShaftReduced Diameter Skirt 0.590 in ODShips in 8 Weeks
WES599-8-RDS-590-TFM8x19.52 mmTri-Flat - Pivoting / Swivel ShaftReduced Diameter Skirt 0.590 in ODShips in 8 Weeks
WES599-8-SM8x119 mmRound - Pivoting / Swivel ShaftStraightShips in 8 Weeks
WES599-8-S2LM8x119 mmRound - Pivoting / Swivel Shaft2-LegShips in 8 Weeks
WES599-8-S2L-QCM8x119 mmQuick Change - Pivoting / Swivel Shaft2-LegShips in 8 Weeks
WES599-8-S2L-TFM8x119 mmTri-Flat - Pivoting / Swivel Shaft2-LegShips in 8 Weeks
WES599-8-S3LM8x119 mmRound - Pivoting / Swivel Shaft3-LegShips in 8 Weeks
WES599-8-S3L-QCM8x119 mmQuick Change - Pivoting / Swivel Shaft3-LegShips in 8 Weeks
WES599-8-S3L-TFM8x119 mmTri-Flat - Pivoting / Swivel Shaft3-LegShips in 8 Weeks
WES599-8-S-875M8x115.88 mmRound - Pivoting / Swivel ShaftStraight 0.875 in ODShips in 8 Weeks
WES599-8-S-875-QCM8x115.88 mmQuick Change - Pivoting / Swivel ShaftStraight 0.875 in ODShips in 8 Weeks
WES599-8-S-875-TFM8x115.88 mmTri-Flat - Pivoting / Swivel ShaftStraight 0.875 in ODShips in 8 Weeks
WES599-8-SBENM8x122 mmRound - Pivoting / Swivel ShaftSlotted Bell External ThreadNylonShips in 8 Weeks
WES599-8-SBEN-QCM8x122 mmQuick Change - Pivoting / Swivel ShaftSlotted Bell External ThreadNylonShips in 8 Weeks
WES599-8-SBEN-TFM8x122 mmTri-Flat - Pivoting / Swivel ShaftSlotted Bell External ThreadNylonShips in 8 Weeks
WES599-8-SBEPM8x122 mmRound - Pivoting / Swivel ShaftSlotted Bell External ThreadPhenolicShips in 8 Weeks
WES599-8-SBEP-QCM8x122 mmQuick Change - Pivoting / Swivel ShaftSlotted Bell External ThreadPhenolicShips in 8 Weeks
WES599-8-SBEP-TFM8x122 mmTri-Flat - Pivoting / Swivel ShaftSlotted Bell External ThreadPhenolicShips in 8 Weeks
WES599-8-SBESM8x122 mmRound - Pivoting / Swivel ShaftSlotted Bell External ThreadSteelShips in 8 Weeks
WES599-8-SBES-QCM8x122 mmQuick Change - Pivoting / Swivel ShaftSlotted Bell External ThreadSteelShips in 8 Weeks
WES599-8-SBES-TFM8x122 mmTri-Flat - Pivoting / Swivel ShaftSlotted Bell External ThreadSteelShips in 8 Weeks
WES599-8-SBINM8x119 mmRound - Pivoting / Swivel ShaftSlotted Bell Internal ThreadNylonShips in 8 Weeks
WES599-8-SBIN-QCM8x119 mmQuick Change - Pivoting / Swivel ShaftSlotted Bell Internal ThreadNylonShips in 8 Weeks
WES599-8-SBIN-TFM8x119 mmTri-Flat - Pivoting / Swivel ShaftSlotted Bell Internal ThreadNylonShips in 8 Weeks
WES599-8-SBIPM8x119 mmRound - Pivoting / Swivel ShaftSlotted Bell Internal ThreadPhenolicShips in 8 Weeks
WES599-8-SBIP-QCM8x119 mmQuick Change - Pivoting / Swivel ShaftSlotted Bell Internal ThreadPhenolicShips in 8 Weeks
WES599-8-SBIP-TFM8x119 mmTri-Flat - Pivoting / Swivel ShaftSlotted Bell Internal ThreadPhenolicShips in 8 Weeks
WES599-8-SBISM8x119 mmRound - Pivoting / Swivel ShaftSlotted Bell Internal ThreadSteelShips in 8 Weeks
WES599-8-SBIS-QCM8x119 mmQuick Change - Pivoting / Swivel ShaftSlotted Bell Internal ThreadSteelShips in 8 Weeks
WES599-8-SBIS-TFM8x119 mmTri-Flat - Pivoting / Swivel ShaftSlotted Bell Internal ThreadSteelShips in 8 Weeks
WES599-8-SCAM8x119 mmRound - Pivoting / Swivel ShaftStraight CutawayShips in 8 Weeks
WES599-8-SCA-QCM8x119 mmQuick Change - Pivoting / Swivel ShaftStraight CutawayShips in 8 Weeks
WES599-8-SCA-TFM8x119 mmTri-Flat - Pivoting / Swivel ShaftStraight CutawayShips in 8 Weeks
WES599-8-SENM8x119 mmRound - Pivoting / Swivel ShaftSlotted External ThreadNylonShips in 8 Weeks
WES599-8-SEN-QCM8x119 mmQuick Change - Pivoting / Swivel ShaftSlotted External ThreadNylonShips in 8 Weeks
WES599-8-SEN-TFM8x119 mmTri-Flat - Pivoting / Swivel ShaftSlotted External ThreadNylonShips in 8 Weeks
WES599-8-SEPM8x119 mmRound - Pivoting / Swivel ShaftSlotted External ThreadPhenolicShips in 8 Weeks
WES599-8-SEP-QCM8x119 mmQuick Change - Pivoting / Swivel ShaftSlotted External ThreadPhenolicShips in 8 Weeks
WES599-8-SEP-TFM8x119 mmTri-Flat - Pivoting / Swivel ShaftSlotted External ThreadPhenolicShips in 8 Weeks
WES599-8-SESM8x119 mmRound - Pivoting / Swivel ShaftSlotted External ThreadSteelShips in 8 Weeks
WES599-8-SES-QCM8x119 mmQuick Change - Pivoting / Swivel ShaftSlotted External ThreadSteelShips in 8 Weeks
WES599-8-SES-TFM8x119 mmTri-Flat - Pivoting / Swivel ShaftSlotted External ThreadSteelShips in 8 Weeks
WES599-8-SFM8x119 mmRound - Pivoting / Swivel ShaftSpherical FlangedShips in 8 Weeks
WES599-8-SF-QCM8x119 mmQuick Change - Pivoting / Swivel ShaftSpherical FlangedShips in 8 Weeks
WES599-8-SF-TFM8x119 mmTri-Flat - Pivoting / Swivel ShaftSpherical FlangedShips in 8 Weeks
WES599-8-SINM8x115 mmRound - Pivoting / Swivel ShaftSlotted Internal ThreadNylonShips in 8 Weeks
WES599-8-SIN-QCM8x115 mmQuick Change - Pivoting / Swivel ShaftSlotted Internal ThreadNylonShips in 8 Weeks
WES599-8-SIN-TFM8x115 mmTri-Flat - Pivoting / Swivel ShaftSlotted Internal ThreadNylonShips in 8 Weeks
WES599-8-SIPM8x115 mmRound - Pivoting / Swivel ShaftSlotted Internal ThreadPhenolicShips in 8 Weeks
WES599-8-SIP-QCM8x115 mmQuick Change - Pivoting / Swivel ShaftSlotted Internal ThreadPhenolicShips in 8 Weeks
WES599-8-SIP-TFM8x115 mmTri-Flat - Pivoting / Swivel ShaftSlotted Internal ThreadPhenolicShips in 8 Weeks
WES599-8-SISM8x115 mmRound - Pivoting / Swivel ShaftSlotted Internal ThreadSteelShips in 8 Weeks
WES599-8-SIS-QCM8x115 mmQuick Change - Pivoting / Swivel ShaftSlotted Internal ThreadSteelShips in 8 Weeks
WES599-8-SIS-TFM8x115 mmTri-Flat - Pivoting / Swivel ShaftSlotted Internal ThreadSteelShips in 8 Weeks
WES599-8-SLM8x119 mmRound - Pivoting / Swivel ShaftSlottedShips in 8 Weeks
WES599-8-SL-QCM8x119 mmQuick Change - Pivoting / Swivel ShaftSlottedShips in 8 Weeks
WES599-8-SL-TFM8x119 mmTri-Flat - Pivoting / Swivel ShaftSlottedShips in 8 Weeks
WES599-8-S-QCM8x119 mmQuick Change - Pivoting / Swivel ShaftStraightShips in 8 Weeks
WES599-8-S-TFM8x119 mmTri-Flat - Pivoting / Swivel ShaftStraightShips in 8 Weeks
WES599-8-VINM8x115 mmRound - Pivoting / Swivel ShaftVacuum Internal ThreadNylonShips in 10 Weeks
WES599-8-VIN-QCM8x115 mmQuick Change - Pivoting / Swivel ShaftVacuum Internal ThreadNylonShips in 10 Weeks
WES599-8-VIN-TFM8x115 mmTri-Flat - Pivoting / Swivel ShaftVacuum Internal ThreadNylonShips in 10 Weeks
WES599-8-VIPM8x115 mmRound - Pivoting / Swivel ShaftVacuum Internal ThreadPhenolicShips in 10 Weeks
WES599-8-VIP-QCM8x115 mmQuick Change - Pivoting / Swivel ShaftVacuum Internal ThreadPhenolicShips in 10 Weeks
WES599-8-VIP-TFM8x115 mmTri-Flat - Pivoting / Swivel ShaftVacuum Internal ThreadPhenolicShips in 10 Weeks
WES599-8-VISM8x115 mmRound - Pivoting / Swivel ShaftVacuum Internal ThreadSteelShips in 10 Weeks
WES599-8-VIS-QCM8x115 mmQuick Change - Pivoting / Swivel ShaftVacuum Internal ThreadSteelShips in 10 Weeks
WES599-8-VIS-TFM8x115 mmTri-Flat - Pivoting / Swivel ShaftVacuum Internal ThreadSteelShips in 10 Weeks

Switching from another manufacturer?

We’re here to help.

Our cross reference tool is the easiest way to find an equivalent or alternate part. If it’s not on our list, we’ll still be able to help you switch, perhaps even design a custom tool to your specification. Send us an email or give us call!

SAME DAY SHIPPING

Don't let delayed shipments hold up your assembly line.

We frequently restock our most popular items. Most of our standard microstops are in stock. All our online orders are fullfilled out of Houston, Texas facility and ships same day on in-stock orders placed before 12 PM CST.

Order online

Wescon USA
© Wescon Industries Inc. 2025601 Century Plaza Dr. Houston, TX 77073Our products are 100% designed and manufactured in our facilities in California and Texas.
Wescon USA