Worldwide Shipping

We accept online orders and ship globally.

Worldwide Shipping

We accept online orders and ship globally.

Wescon 696 Microstop - 3/8-24 - 7/8" Cutter Capacity - Slotted External Thread Skirt - Steel Foot

LARGE CAPACITY UNITS FOR ALUMINUM & COMPOSITES
Part NumberWES696-875-SES
Measurement Type
Imperial
Bearing Rating
10,000 rpm
Bearing Type
Dual Ball-Bearings
Heavy Duty Thrust Bearing
Yes
Incremental Adjustment
0.0005 in
Shaft Travel
1/2 in
Dust Seal
Integrated Dust Seal
Cutter Thread
3/8-24
Shaft
Round
Shaft Diameter
3/8 in
Cutter Capacity
7/8 in
Skirt
Slotted External Thread
Foot
Steel
Solid Stop
Yes
Material
Steel
Country of Origin
USA
* The image represents the general look of the series. Actual product may vary based on options selected.
Stock
: 
Ships in 3 Weeks
  
Login to access real-time inventory.
Price: $170.00
YOUR BUILD
WES696-875-SES
$170.00
Stock: Ships in 3 Weeks

CONFIGURE

Your Selected Model:  WES696-875-SES

Model Options: 7/8 in Cutter Capacity (875)

875

7/8 in Cutter Capacity

1000

1 in Cutter Capacity

1250

1-1/4 in Cutter Capacity

1375

1-3/8 in Cutter Capacity

1500

1-1/2 in Cutter Capacity

2000

2 in Cutter Capacity

Skirt Style: Slotted External Thread (SE)

Straight

STANDARD

Straight

Slotted

SL

Slotted

External Thread

E

External Thread

Slotted External Thread

SE

Slotted External Thread

2-Leg

S2L

2-Leg

3-Leg

S3L

3-Leg

Straight Cutaway

SCA

Straight Cutaway

Foot Style: Steel (S)

N

Nylon

S

Steel

Shaft Style: Round (STANDARD)

Round

STANDARD

Round

Tri-Flat

TF

Tri-Flat

Quick Change

QC

Quick Change

Shaft Thread: 3/8-24 (STANDARD)

3/8-24

STANDARD

3/8-24

7/16-20

4320

7/16-20

M8x1

8

M8x1

M10x1

10

M10x1

Also Referred to as

  • 696-875-SES
  • Micro-stop 696-875-SES
  • Regulador Micrometrico 696-875-SES
  • Butee Micrometrique
  • Micro-Stops de avellanado
  • Countersink cage 696-875-SES
  • Micro stop drill cage 696-875-SES
  • Large
  • Jumbo

VARIANTS - WES696 Microstops

Part NumberLead TimeCutter ThreadCutter CapacityShaft StyleSkirtFoot
WES696-1000Ships Next Business Day3/8-241 inRoundStraight
WES696-1000-4320Ships in 3 Weeks7/16-201 inRoundStraight
WES696-1000-4320-QCShips in 3 Weeks7/16-201 inQuick ChangeStraight
WES696-1000-4320-TFShips in 3 Weeks7/16-201 inTri-FlatStraight
WES696-1000-ENShips Next Business Day3/8-241 inRoundExternal ThreadNylon
WES696-1000-EN-4320Ships in 3 Weeks7/16-201 inRoundExternal ThreadNylon
WES696-1000-EN-4320-QCShips in 3 Weeks7/16-201 inQuick ChangeExternal ThreadNylon
WES696-1000-EN-4320-TFShips in 3 Weeks7/16-201 inTri-FlatExternal ThreadNylon
WES696-1000-EN-QCShips in 3 Weeks3/8-241 inQuick ChangeExternal ThreadNylon
WES696-1000-EN-TFShips in 3 Weeks3/8-241 inTri-FlatExternal ThreadNylon
WES696-1000-ESShips in 3 Weeks3/8-241 inRoundExternal ThreadSteel
WES696-1000-ES-4320Ships in 3 Weeks7/16-201 inRoundExternal ThreadSteel
WES696-1000-ES-4320-QCShips in 3 Weeks7/16-201 inQuick ChangeExternal ThreadSteel
WES696-1000-ES-4320-TFShips in 3 Weeks7/16-201 inTri-FlatExternal ThreadSteel
WES696-1000-ES-QCShips in 3 Weeks3/8-241 inQuick ChangeExternal ThreadSteel
WES696-1000-ES-TFShips in 3 Weeks3/8-241 inTri-FlatExternal ThreadSteel
WES696-1000-QCShips in 3 Weeks3/8-241 inQuick ChangeStraight
WES696-1000-S2LShips in 3 Weeks3/8-241 inRound2-Leg
WES696-1000-S2L-4320Ships in 3 Weeks7/16-201 inRound2-Leg
WES696-1000-S2L-4320-QCShips in 3 Weeks7/16-201 inQuick Change2-Leg
WES696-1000-S2L-4320-TFShips in 3 Weeks7/16-201 inTri-Flat2-Leg
WES696-1000-S2L-QCShips in 3 Days3/8-241 inQuick Change2-Leg
WES696-1000-S2L-TFShips in 3 Days3/8-241 inTri-Flat2-Leg
WES696-1000-S3LShips in 3 Weeks3/8-241 inRound3-Leg
WES696-1000-S3L-4320Ships in 3 Weeks7/16-201 inRound3-Leg
WES696-1000-S3L-4320-QCShips in 3 Weeks7/16-201 inQuick Change3-Leg
WES696-1000-S3L-4320-TFShips in 3 Weeks7/16-201 inTri-Flat3-Leg
WES696-1000-S3L-QCShips in 3 Weeks3/8-241 inQuick Change3-Leg
WES696-1000-S3L-TFShips in 3 Weeks3/8-241 inTri-Flat3-Leg
WES696-1000-SCAShips in 3 Weeks3/8-241 inRoundStraight Cutaway
WES696-1000-SCA-4320Ships in 3 Weeks7/16-201 inRoundStraight Cutaway
WES696-1000-SCA-4320-QCShips in 3 Weeks7/16-201 inQuick ChangeStraight Cutaway
WES696-1000-SCA-4320-TFShips in 3 Weeks7/16-201 inTri-FlatStraight Cutaway
WES696-1000-SCA-QCShips in 3 Weeks3/8-241 inQuick ChangeStraight Cutaway
WES696-1000-SCA-TFShips in 3 Weeks3/8-241 inTri-FlatStraight Cutaway
WES696-1000-SENShips in 3 Weeks3/8-241 inRoundSlotted External ThreadNylon
WES696-1000-SEN-4320Ships in 3 Weeks7/16-201 inRoundSlotted External ThreadNylon
WES696-1000-SEN-4320-QCShips in 3 Weeks7/16-201 inQuick ChangeSlotted External ThreadNylon
WES696-1000-SEN-4320-TFShips in 3 Weeks7/16-201 inTri-FlatSlotted External ThreadNylon
WES696-1000-SEN-QCShips in 3 Weeks3/8-241 inQuick ChangeSlotted External ThreadNylon
WES696-1000-SEN-TFShips in 3 Weeks3/8-241 inTri-FlatSlotted External ThreadNylon
WES696-1000-SESShips in 3 Weeks3/8-241 inRoundSlotted External ThreadSteel
WES696-1000-SES-4320Ships in 3 Weeks7/16-201 inRoundSlotted External ThreadSteel
WES696-1000-SES-4320-QCShips in 3 Weeks7/16-201 inQuick ChangeSlotted External ThreadSteel
WES696-1000-SES-4320-TFShips in 3 Weeks7/16-201 inTri-FlatSlotted External ThreadSteel
WES696-1000-SES-QCShips in 3 Weeks3/8-241 inQuick ChangeSlotted External ThreadSteel
WES696-1000-SES-TFShips in 3 Weeks3/8-241 inTri-FlatSlotted External ThreadSteel
WES696-1000-SLShips in 5 Weeks3/8-241 inRoundSlotted
WES696-1000-SL-4320Ships in 5 Weeks7/16-201 inRoundSlotted
WES696-1000-SL-4320-QCShips in 5 Weeks7/16-201 inQuick ChangeSlotted
WES696-1000-SL-4320-TFShips in 5 Weeks7/16-201 inTri-FlatSlotted
WES696-1000-SL-QCShips in 5 Weeks3/8-241 inQuick ChangeSlotted
WES696-1000-SL-TFShips in 5 Weeks3/8-241 inTri-FlatSlotted
WES696-1000-TFShips in 3 Weeks3/8-241 inTri-FlatStraight
WES696-1250Ships in 3 Weeks3/8-241-1/4 inRoundStraight
WES696-1250-4320Ships in 3 Weeks7/16-201-1/4 inRoundStraight
WES696-1250-4320-QCShips in 3 Weeks7/16-201-1/4 inQuick ChangeStraight
WES696-1250-4320-TFShips in 3 Weeks7/16-201-1/4 inTri-FlatStraight
WES696-1250-ENShips in 3 Weeks3/8-241-1/4 inRoundExternal ThreadNylon
WES696-1250-EN-4320Ships in 3 Weeks7/16-201-1/4 inRoundExternal ThreadNylon
WES696-1250-EN-4320-QCShips in 3 Weeks7/16-201-1/4 inQuick ChangeExternal ThreadNylon
WES696-1250-EN-4320-TFShips in 3 Weeks7/16-201-1/4 inTri-FlatExternal ThreadNylon
WES696-1250-EN-QCShips in 3 Days3/8-241-1/4 inQuick ChangeExternal ThreadNylon
WES696-1250-EN-TFShips in 3 Days3/8-241-1/4 inTri-FlatExternal ThreadNylon
WES696-1250-ESShips in 3 Weeks3/8-241-1/4 inRoundExternal ThreadSteel
WES696-1250-ES-4320Ships in 3 Weeks7/16-201-1/4 inRoundExternal ThreadSteel
WES696-1250-ES-4320-QCShips in 3 Weeks7/16-201-1/4 inQuick ChangeExternal ThreadSteel
WES696-1250-ES-4320-TFShips in 3 Weeks7/16-201-1/4 inTri-FlatExternal ThreadSteel
WES696-1250-ES-QCShips in 3 Weeks3/8-241-1/4 inQuick ChangeExternal ThreadSteel
WES696-1250-ES-TFShips in 3 Weeks3/8-241-1/4 inTri-FlatExternal ThreadSteel
WES696-1250-QCShips in 3 Days3/8-241-1/4 inQuick ChangeStraight
WES696-1250-S2LShips in 3 Weeks3/8-241-1/4 inRound2-Leg
WES696-1250-S2L-4320Ships in 3 Weeks7/16-201-1/4 inRound2-Leg
WES696-1250-S2L-4320-QCShips in 3 Weeks7/16-201-1/4 inQuick Change2-Leg
WES696-1250-S2L-4320-TFShips in 3 Weeks7/16-201-1/4 inTri-Flat2-Leg
WES696-1250-S2L-QCShips in 3 Weeks3/8-241-1/4 inQuick Change2-Leg
WES696-1250-S2L-TFShips in 3 Weeks3/8-241-1/4 inTri-Flat2-Leg
WES696-1250-S3LShips Next Business Day3/8-241-1/4 inRound3-Leg
WES696-1250-S3L-4320Ships in 3 Weeks7/16-201-1/4 inRound3-Leg
WES696-1250-S3L-4320-QCShips in 3 Weeks7/16-201-1/4 inQuick Change3-Leg
WES696-1250-S3L-4320-TFShips in 3 Weeks7/16-201-1/4 inTri-Flat3-Leg
WES696-1250-S3L-QCShips in 3 Days3/8-241-1/4 inQuick Change3-Leg
WES696-1250-S3L-TFShips in 3 Days3/8-241-1/4 inTri-Flat3-Leg
WES696-1250-SCAShips in 3 Weeks3/8-241-1/4 inRoundStraight Cutaway
WES696-1250-SCA-4320Ships in 3 Weeks7/16-201-1/4 inRoundStraight Cutaway
WES696-1250-SCA-4320-QCShips in 3 Weeks7/16-201-1/4 inQuick ChangeStraight Cutaway
WES696-1250-SCA-4320-TFShips in 3 Weeks7/16-201-1/4 inTri-FlatStraight Cutaway
WES696-1250-SCA-QCShips in 3 Weeks3/8-241-1/4 inQuick ChangeStraight Cutaway
WES696-1250-SCA-TFShips in 3 Weeks3/8-241-1/4 inTri-FlatStraight Cutaway
WES696-1250-SENShips in 3 Weeks3/8-241-1/4 inRoundSlotted External ThreadNylon
WES696-1250-SEN-4320Ships in 3 Weeks7/16-201-1/4 inRoundSlotted External ThreadNylon
WES696-1250-SEN-4320-QCShips in 3 Weeks7/16-201-1/4 inQuick ChangeSlotted External ThreadNylon
WES696-1250-SEN-4320-TFShips in 3 Weeks7/16-201-1/4 inTri-FlatSlotted External ThreadNylon
WES696-1250-SEN-QCShips in 3 Weeks3/8-241-1/4 inQuick ChangeSlotted External ThreadNylon
WES696-1250-SEN-TFShips in 3 Weeks3/8-241-1/4 inTri-FlatSlotted External ThreadNylon
WES696-1250-SESShips in 3 Weeks3/8-241-1/4 inRoundSlotted External ThreadSteel
WES696-1250-SES-4320Ships in 3 Weeks7/16-201-1/4 inRoundSlotted External ThreadSteel
WES696-1250-SES-4320-QCShips in 3 Weeks7/16-201-1/4 inQuick ChangeSlotted External ThreadSteel
WES696-1250-SES-4320-TFShips in 3 Weeks7/16-201-1/4 inTri-FlatSlotted External ThreadSteel
WES696-1250-SES-QCShips in 3 Weeks3/8-241-1/4 inQuick ChangeSlotted External ThreadSteel
WES696-1250-SES-TFShips in 3 Weeks3/8-241-1/4 inTri-FlatSlotted External ThreadSteel
WES696-1250-SLShips in 5 Weeks3/8-241-1/4 inRoundSlotted
WES696-1250-SL-4320Ships in 5 Weeks7/16-201-1/4 inRoundSlotted
WES696-1250-SL-4320-QCShips in 5 Weeks7/16-201-1/4 inQuick ChangeSlotted
WES696-1250-SL-4320-TFShips in 5 Weeks7/16-201-1/4 inTri-FlatSlotted
WES696-1250-SL-QCShips in 5 Weeks3/8-241-1/4 inQuick ChangeSlotted
WES696-1250-SL-TFShips in 5 Weeks3/8-241-1/4 inTri-FlatSlotted
WES696-1250-TFShips in 3 Days3/8-241-1/4 inTri-FlatStraight
WES696-1375Ships Next Business Day3/8-241-3/8 inRoundStraight
WES696-1375-4320Ships in 3 Weeks7/16-201-3/8 inRoundStraight
WES696-1375-4320-QCShips in 3 Weeks7/16-201-3/8 inQuick ChangeStraight
WES696-1375-4320-TFShips in 3 Weeks7/16-201-3/8 inTri-FlatStraight
WES696-1375-ENShips in 3 Weeks3/8-241-3/8 inRoundExternal ThreadNylon
WES696-1375-EN-4320Ships in 3 Weeks7/16-201-3/8 inRoundExternal ThreadNylon
WES696-1375-EN-4320-QCShips in 3 Weeks7/16-201-3/8 inQuick ChangeExternal ThreadNylon
WES696-1375-EN-4320-TFShips in 3 Weeks7/16-201-3/8 inTri-FlatExternal ThreadNylon
WES696-1375-EN-QCShips in 3 Weeks3/8-241-3/8 inQuick ChangeExternal ThreadNylon
WES696-1375-EN-TFShips in 3 Weeks3/8-241-3/8 inTri-FlatExternal ThreadNylon
WES696-1375-ESShips in 3 Weeks3/8-241-3/8 inRoundExternal ThreadSteel
WES696-1375-ES-4320Ships in 3 Weeks7/16-201-3/8 inRoundExternal ThreadSteel
WES696-1375-ES-4320-QCShips in 3 Weeks7/16-201-3/8 inQuick ChangeExternal ThreadSteel
WES696-1375-ES-4320-TFShips in 3 Weeks7/16-201-3/8 inTri-FlatExternal ThreadSteel
WES696-1375-ES-QCShips in 3 Weeks3/8-241-3/8 inQuick ChangeExternal ThreadSteel
WES696-1375-ES-TFShips in 3 Weeks3/8-241-3/8 inTri-FlatExternal ThreadSteel
WES696-1375-QCShips in 3 Days3/8-241-3/8 inQuick ChangeStraight
WES696-1375-S2LShips in 3 Weeks3/8-241-3/8 inRound2-Leg
WES696-1375-S2L-4320Ships in 3 Weeks7/16-201-3/8 inRound2-Leg
WES696-1375-S2L-4320-QCShips in 3 Weeks7/16-201-3/8 inQuick Change2-Leg
WES696-1375-S2L-4320-TFShips in 3 Weeks7/16-201-3/8 inTri-Flat2-Leg
WES696-1375-S2L-QCShips in 3 Weeks3/8-241-3/8 inQuick Change2-Leg
WES696-1375-S2L-TFShips in 3 Weeks3/8-241-3/8 inTri-Flat2-Leg
WES696-1375-S3LShips Next Business Day3/8-241-3/8 inRound3-Leg
WES696-1375-S3L-4320Ships in 3 Weeks7/16-201-3/8 inRound3-Leg
WES696-1375-S3L-4320-QCShips in 3 Weeks7/16-201-3/8 inQuick Change3-Leg
WES696-1375-S3L-4320-TFShips in 3 Weeks7/16-201-3/8 inTri-Flat3-Leg
WES696-1375-S3L-QCShips in 3 Days3/8-241-3/8 inQuick Change3-Leg
WES696-1375-S3L-TFShips in 3 Days3/8-241-3/8 inTri-Flat3-Leg
WES696-1375-SCAShips in 3 Weeks3/8-241-3/8 inRoundStraight Cutaway
WES696-1375-SCA-4320Ships in 3 Weeks7/16-201-3/8 inRoundStraight Cutaway
WES696-1375-SCA-4320-QCShips in 3 Weeks7/16-201-3/8 inQuick ChangeStraight Cutaway
WES696-1375-SCA-4320-TFShips in 3 Weeks7/16-201-3/8 inTri-FlatStraight Cutaway
WES696-1375-SCA-QCShips in 3 Weeks3/8-241-3/8 inQuick ChangeStraight Cutaway
WES696-1375-SCA-TFShips in 3 Weeks3/8-241-3/8 inTri-FlatStraight Cutaway
WES696-1375-SENShips in 3 Weeks3/8-241-3/8 inRoundSlotted External ThreadNylon
WES696-1375-SEN-4320Ships in 3 Weeks7/16-201-3/8 inRoundSlotted External ThreadNylon
WES696-1375-SEN-4320-QCShips in 3 Weeks7/16-201-3/8 inQuick ChangeSlotted External ThreadNylon
WES696-1375-SEN-4320-TFShips in 3 Weeks7/16-201-3/8 inTri-FlatSlotted External ThreadNylon
WES696-1375-SEN-QCShips in 3 Weeks3/8-241-3/8 inQuick ChangeSlotted External ThreadNylon
WES696-1375-SEN-TFShips in 3 Weeks3/8-241-3/8 inTri-FlatSlotted External ThreadNylon
WES696-1375-SESShips in 3 Weeks3/8-241-3/8 inRoundSlotted External ThreadSteel
WES696-1375-SES-4320Ships in 3 Weeks7/16-201-3/8 inRoundSlotted External ThreadSteel
WES696-1375-SES-4320-QCShips in 3 Weeks7/16-201-3/8 inQuick ChangeSlotted External ThreadSteel
WES696-1375-SES-4320-TFShips in 3 Weeks7/16-201-3/8 inTri-FlatSlotted External ThreadSteel
WES696-1375-SES-QCShips in 3 Weeks3/8-241-3/8 inQuick ChangeSlotted External ThreadSteel
WES696-1375-SES-TFShips in 3 Weeks3/8-241-3/8 inTri-FlatSlotted External ThreadSteel
WES696-1375-SLShips in 5 Weeks3/8-241-3/8 inRoundSlotted
WES696-1375-SL-4320Ships in 5 Weeks7/16-201-3/8 inRoundSlotted
WES696-1375-SL-4320-QCShips in 5 Weeks7/16-201-3/8 inQuick ChangeSlotted
WES696-1375-SL-4320-TFShips in 5 Weeks7/16-201-3/8 inTri-FlatSlotted
WES696-1375-SL-QCShips in 5 Weeks3/8-241-3/8 inQuick ChangeSlotted
WES696-1375-SL-TFShips in 5 Weeks3/8-241-3/8 inTri-FlatSlotted
WES696-1375-TFShips in 3 Days3/8-241-3/8 inTri-FlatStraight
WES696-1500-4320-TFShips in 3 Weeks7/16-201-1/2 inTri-FlatStraight
WES696-1500-EN-4320-TFShips in 3 Weeks7/16-201-1/2 inTri-FlatExternal ThreadNylon
WES696-1500-EN-TFShips in 3 Weeks3/8-241-1/2 inTri-FlatExternal ThreadNylon
WES696-1500-ES-4320-TFShips in 3 Weeks7/16-201-1/2 inTri-FlatExternal ThreadSteel
WES696-1500-ES-TFShips in 3 Weeks3/8-241-1/2 inTri-FlatExternal ThreadSteel
WES696-1500-S2L-4320-TFShips in 3 Weeks7/16-201-1/2 inTri-Flat2-Leg
WES696-1500-S2L-TFShips in 3 Weeks3/8-241-1/2 inTri-Flat2-Leg
WES696-1500-S3L-4320-TFShips in 3 Weeks7/16-201-1/2 inTri-Flat3-Leg
WES696-1500-S3L-TFShips in 3 Weeks3/8-241-1/2 inTri-Flat3-Leg
WES696-1500-SCA-4320-TFShips in 3 Weeks7/16-201-1/2 inTri-FlatStraight Cutaway
WES696-1500-SCA-TFShips in 3 Weeks3/8-241-1/2 inTri-FlatStraight Cutaway
WES696-1500-SEN-4320-TFShips in 3 Weeks7/16-201-1/2 inTri-FlatSlotted External ThreadNylon
WES696-1500-SEN-TFShips in 3 Weeks3/8-241-1/2 inTri-FlatSlotted External ThreadNylon
WES696-1500-SES-4320-TFShips in 3 Weeks7/16-201-1/2 inTri-FlatSlotted External ThreadSteel
WES696-1500-SES-TFShips in 3 Weeks3/8-241-1/2 inTri-FlatSlotted External ThreadSteel
WES696-1500-SL-4320-TFShips in 5 Weeks7/16-201-1/2 inTri-FlatSlotted
WES696-1500-SL-TFShips in 5 Weeks3/8-241-1/2 inTri-FlatSlotted
WES696-1500-TFShips Next Business Day3/8-241-1/2 inTri-FlatStraight
WES696-2000-4320-TFShips in 4 Weeks7/16-202 inTri-FlatStraight
WES696-2000-EN-4320-TFShips in 4 Weeks7/16-202 inTri-FlatExternal ThreadNylon
WES696-2000-EN-TFShips in 4 Weeks3/8-242 inTri-FlatExternal ThreadNylon
WES696-2000-ES-4320-TFShips in 4 Weeks7/16-202 inTri-FlatExternal ThreadSteel
WES696-2000-ES-TFShips in 4 Weeks3/8-242 inTri-FlatExternal ThreadSteel
WES696-2000-S2L-4320-TFShips in 4 Weeks7/16-202 inTri-Flat2-Leg
WES696-2000-S2L-TFShips in 4 Weeks3/8-242 inTri-Flat2-Leg
WES696-2000-S3L-4320-TFShips in 4 Weeks7/16-202 inTri-Flat3-Leg
WES696-2000-S3L-TFShips in 4 Weeks3/8-242 inTri-Flat3-Leg
WES696-2000-SCA-4320-TFShips in 4 Weeks7/16-202 inTri-FlatStraight Cutaway
WES696-2000-SCA-TFShips in 4 Weeks3/8-242 inTri-FlatStraight Cutaway
WES696-2000-SEN-4320-TFShips in 4 Weeks7/16-202 inTri-FlatSlotted External ThreadNylon
WES696-2000-SEN-TFShips in 4 Weeks3/8-242 inTri-FlatSlotted External ThreadNylon
WES696-2000-SES-4320-TFShips in 4 Weeks7/16-202 inTri-FlatSlotted External ThreadSteel
WES696-2000-SES-TFShips in 4 Weeks3/8-242 inTri-FlatSlotted External ThreadSteel
WES696-2000-SL-4320-TFShips in 6 Weeks7/16-202 inTri-FlatSlotted
WES696-2000-SL-TFShips in 6 Weeks3/8-242 inTri-FlatSlotted
WES696-2000-TFShips in 4 Weeks3/8-242 inTri-FlatStraight
WES696-875Ships Next Business Day3/8-247/8 inRoundStraight
WES696-875-4320Ships in 3 Weeks7/16-207/8 inRoundStraight
WES696-875-4320-QCShips in 3 Weeks7/16-207/8 inQuick ChangeStraight
WES696-875-4320-TFShips in 3 Weeks7/16-207/8 inTri-FlatStraight
WES696-875-ENShips in 3 Weeks3/8-247/8 inRoundExternal ThreadNylon
WES696-875-EN-4320Ships in 3 Weeks7/16-207/8 inRoundExternal ThreadNylon
WES696-875-EN-4320-QCShips in 3 Weeks7/16-207/8 inQuick ChangeExternal ThreadNylon
WES696-875-EN-4320-TFShips in 3 Weeks7/16-207/8 inTri-FlatExternal ThreadNylon
WES696-875-EN-QCShips in 3 Weeks3/8-247/8 inQuick ChangeExternal ThreadNylon
WES696-875-EN-TFShips in 3 Weeks3/8-247/8 inTri-FlatExternal ThreadNylon
WES696-875-ESShips in 3 Weeks3/8-247/8 inRoundExternal ThreadSteel
WES696-875-ES-4320Ships in 3 Weeks7/16-207/8 inRoundExternal ThreadSteel
WES696-875-ES-4320-QCShips in 3 Weeks7/16-207/8 inQuick ChangeExternal ThreadSteel
WES696-875-ES-4320-TFShips in 3 Weeks7/16-207/8 inTri-FlatExternal ThreadSteel
WES696-875-ES-QCShips in 3 Weeks3/8-247/8 inQuick ChangeExternal ThreadSteel
WES696-875-ES-TFShips in 3 Weeks3/8-247/8 inTri-FlatExternal ThreadSteel
WES696-875-QCShips in 3 Days3/8-247/8 inQuick ChangeStraight
WES696-875-S2LShips in 3 Weeks3/8-247/8 inRound2-Leg
WES696-875-S2L-4320Ships Next Business Day7/16-207/8 inRound2-Leg
WES696-875-S2L-4320-QCShips in 3 Weeks7/16-207/8 inQuick Change2-Leg
WES696-875-S2L-4320-TFShips in 3 Weeks7/16-207/8 inTri-Flat2-Leg
WES696-875-S2L-QCShips in 3 Weeks3/8-247/8 inQuick Change2-Leg
WES696-875-S2L-TFShips in 3 Weeks3/8-247/8 inTri-Flat2-Leg
WES696-875-S3LShips Next Business Day3/8-247/8 inRound3-Leg
WES696-875-S3L-4320Ships in 3 Weeks7/16-207/8 inRound3-Leg
WES696-875-S3L-4320-QCShips in 3 Weeks7/16-207/8 inQuick Change3-Leg
WES696-875-S3L-4320-TFShips in 3 Weeks7/16-207/8 inTri-Flat3-Leg
WES696-875-S3L-QCShips in 3 Days3/8-247/8 inQuick Change3-Leg
WES696-875-S3L-TFShips in 3 Days3/8-247/8 inTri-Flat3-Leg
WES696-875-SCAShips Next Business Day3/8-247/8 inRoundStraight Cutaway
WES696-875-SCA-4320Ships in 3 Weeks7/16-207/8 inRoundStraight Cutaway
WES696-875-SCA-4320-QCShips in 3 Weeks7/16-207/8 inQuick ChangeStraight Cutaway
WES696-875-SCA-4320-TFShips in 3 Weeks7/16-207/8 inTri-FlatStraight Cutaway
WES696-875-SCA-QCShips in 3 Days3/8-247/8 inQuick ChangeStraight Cutaway
WES696-875-SCA-TFShips in 3 Days3/8-247/8 inTri-FlatStraight Cutaway
WES696-875-SENShips in 3 Weeks3/8-247/8 inRoundSlotted External ThreadNylon
WES696-875-SEN-4320Ships in 3 Weeks7/16-207/8 inRoundSlotted External ThreadNylon
WES696-875-SEN-4320-QCShips in 3 Weeks7/16-207/8 inQuick ChangeSlotted External ThreadNylon
WES696-875-SEN-4320-TFShips in 3 Weeks7/16-207/8 inTri-FlatSlotted External ThreadNylon
WES696-875-SEN-QCShips in 3 Weeks3/8-247/8 inQuick ChangeSlotted External ThreadNylon
WES696-875-SEN-TFShips in 3 Weeks3/8-247/8 inTri-FlatSlotted External ThreadNylon
WES696-875-SESShips in 3 Weeks3/8-247/8 inRoundSlotted External ThreadSteel
WES696-875-SES-4320Ships in 3 Weeks7/16-207/8 inRoundSlotted External ThreadSteel
WES696-875-SES-4320-QCShips in 3 Weeks7/16-207/8 inQuick ChangeSlotted External ThreadSteel
WES696-875-SES-4320-TFShips in 3 Weeks7/16-207/8 inTri-FlatSlotted External ThreadSteel
WES696-875-SES-QCShips in 3 Weeks3/8-247/8 inQuick ChangeSlotted External ThreadSteel
WES696-875-SES-TFShips in 3 Weeks3/8-247/8 inTri-FlatSlotted External ThreadSteel
WES696-875-SLShips in 5 Weeks3/8-247/8 inRoundSlotted
WES696-875-SL-4320Ships in 5 Weeks7/16-207/8 inRoundSlotted
WES696-875-SL-4320-QCShips in 5 Weeks7/16-207/8 inQuick ChangeSlotted
WES696-875-SL-4320-TFShips in 5 Weeks7/16-207/8 inTri-FlatSlotted
WES696-875-SL-QCShips in 5 Weeks3/8-247/8 inQuick ChangeSlotted
WES696-875-SL-TFShips in 5 Weeks3/8-247/8 inTri-FlatSlotted
WES696-875-TFShips Next Business Day3/8-247/8 inTri-FlatStraight
WES696-10-1000Ships in 3 WeeksM10x125 mmRoundStraight
WES696-10-1000-ENShips in 3 WeeksM10x125 mmRoundExternal ThreadNylon
WES696-10-1000-EN-QCShips in 3 WeeksM10x125 mmQuick ChangeExternal ThreadNylon
WES696-10-1000-EN-TFShips in 3 WeeksM10x125 mmTri-FlatExternal ThreadNylon
WES696-10-1000-ESShips in 3 WeeksM10x125 mmRoundExternal ThreadSteel
WES696-10-1000-ES-QCShips in 3 WeeksM10x125 mmQuick ChangeExternal ThreadSteel
WES696-10-1000-ES-TFShips in 3 WeeksM10x125 mmTri-FlatExternal ThreadSteel
WES696-10-1000-QCShips in 3 WeeksM10x125 mmQuick ChangeStraight
WES696-10-1000-S2LShips in 3 WeeksM10x125 mmRound2-Leg
WES696-10-1000-S2L-QCShips in 3 WeeksM10x125 mmQuick Change2-Leg
WES696-10-1000-S2L-TFShips in 3 WeeksM10x125 mmTri-Flat2-Leg
WES696-10-1000-S3LShips in 3 WeeksM10x125 mmRound3-Leg
WES696-10-1000-S3L-QCShips in 3 WeeksM10x125 mmQuick Change3-Leg
WES696-10-1000-S3L-TFShips in 3 WeeksM10x125 mmTri-Flat3-Leg
WES696-10-1000-SCAShips in 3 WeeksM10x125 mmRoundStraight Cutaway
WES696-10-1000-SCA-QCShips in 3 WeeksM10x125 mmQuick ChangeStraight Cutaway
WES696-10-1000-SCA-TFShips in 3 WeeksM10x125 mmTri-FlatStraight Cutaway
WES696-10-1000-SENShips in 3 WeeksM10x125 mmRoundSlotted External ThreadNylon
WES696-10-1000-SEN-QCShips in 3 WeeksM10x125 mmQuick ChangeSlotted External ThreadNylon
WES696-10-1000-SEN-TFShips in 3 WeeksM10x125 mmTri-FlatSlotted External ThreadNylon
WES696-10-1000-SESShips in 3 WeeksM10x125 mmRoundSlotted External ThreadSteel
WES696-10-1000-SES-QCShips in 3 WeeksM10x125 mmQuick ChangeSlotted External ThreadSteel
WES696-10-1000-SES-TFShips in 3 WeeksM10x125 mmTri-FlatSlotted External ThreadSteel
WES696-10-1000-SLShips in 5 WeeksM10x125 mmRoundSlotted
WES696-10-1000-SL-QCShips in 5 WeeksM10x125 mmQuick ChangeSlotted
WES696-10-1000-SL-TFShips in 5 WeeksM10x125 mmTri-FlatSlotted
WES696-10-1000-TFShips in 3 WeeksM10x125 mmTri-FlatStraight
WES696-10-1250Ships in 3 WeeksM10x132 mmRoundStraight
WES696-10-1250-ENShips in 3 WeeksM10x132 mmRoundExternal ThreadNylon
WES696-10-1250-EN-QCShips in 3 WeeksM10x132 mmQuick ChangeExternal ThreadNylon
WES696-10-1250-EN-TFShips in 3 WeeksM10x132 mmTri-FlatExternal ThreadNylon
WES696-10-1250-ESShips in 3 WeeksM10x132 mmRoundExternal ThreadSteel
WES696-10-1250-ES-QCShips in 3 WeeksM10x132 mmQuick ChangeExternal ThreadSteel
WES696-10-1250-ES-TFShips in 3 WeeksM10x132 mmTri-FlatExternal ThreadSteel
WES696-10-1250-QCShips in 3 WeeksM10x132 mmQuick ChangeStraight
WES696-10-1250-S2LShips in 3 WeeksM10x132 mmRound2-Leg
WES696-10-1250-S2L-QCShips in 3 WeeksM10x132 mmQuick Change2-Leg
WES696-10-1250-S2L-TFShips in 3 WeeksM10x132 mmTri-Flat2-Leg
WES696-10-1250-S3LShips in 3 WeeksM10x132 mmRound3-Leg
WES696-10-1250-S3L-QCShips in 3 WeeksM10x132 mmQuick Change3-Leg
WES696-10-1250-S3L-TFShips in 3 WeeksM10x132 mmTri-Flat3-Leg
WES696-10-1250-SCAShips in 3 WeeksM10x132 mmRoundStraight Cutaway
WES696-10-1250-SCA-QCShips in 3 WeeksM10x132 mmQuick ChangeStraight Cutaway
WES696-10-1250-SCA-TFShips in 3 WeeksM10x132 mmTri-FlatStraight Cutaway
WES696-10-1250-SENShips in 3 WeeksM10x132 mmRoundSlotted External ThreadNylon
WES696-10-1250-SEN-QCShips in 3 WeeksM10x132 mmQuick ChangeSlotted External ThreadNylon
WES696-10-1250-SEN-TFShips in 3 WeeksM10x132 mmTri-FlatSlotted External ThreadNylon
WES696-10-1250-SESShips in 3 WeeksM10x132 mmRoundSlotted External ThreadSteel
WES696-10-1250-SES-QCShips in 3 WeeksM10x132 mmQuick ChangeSlotted External ThreadSteel
WES696-10-1250-SES-TFShips in 3 WeeksM10x132 mmTri-FlatSlotted External ThreadSteel
WES696-10-1250-SLShips in 5 WeeksM10x132 mmRoundSlotted
WES696-10-1250-SL-QCShips in 5 WeeksM10x132 mmQuick ChangeSlotted
WES696-10-1250-SL-TFShips in 5 WeeksM10x132 mmTri-FlatSlotted
WES696-10-1250-TFShips in 3 WeeksM10x132 mmTri-FlatStraight
WES696-10-1375Ships in 3 WeeksM10x135 mmRoundStraight
WES696-10-1375-ENShips in 3 WeeksM10x135 mmRoundExternal ThreadNylon
WES696-10-1375-EN-QCShips in 3 WeeksM10x135 mmQuick ChangeExternal ThreadNylon
WES696-10-1375-EN-TFShips in 3 WeeksM10x135 mmTri-FlatExternal ThreadNylon
WES696-10-1375-ESShips in 3 WeeksM10x135 mmRoundExternal ThreadSteel
WES696-10-1375-ES-QCShips in 3 WeeksM10x135 mmQuick ChangeExternal ThreadSteel
WES696-10-1375-ES-TFShips in 3 WeeksM10x135 mmTri-FlatExternal ThreadSteel
WES696-10-1375-QCShips in 3 WeeksM10x135 mmQuick ChangeStraight
WES696-10-1375-S2LShips in 3 WeeksM10x135 mmRound2-Leg
WES696-10-1375-S2L-QCShips in 3 WeeksM10x135 mmQuick Change2-Leg
WES696-10-1375-S2L-TFShips in 3 WeeksM10x135 mmTri-Flat2-Leg
WES696-10-1375-S3LShips in 3 WeeksM10x135 mmRound3-Leg
WES696-10-1375-S3L-QCShips in 3 WeeksM10x135 mmQuick Change3-Leg
WES696-10-1375-S3L-TFShips in 3 WeeksM10x135 mmTri-Flat3-Leg
WES696-10-1375-SCAShips in 3 WeeksM10x135 mmRoundStraight Cutaway
WES696-10-1375-SCA-QCShips in 3 WeeksM10x135 mmQuick ChangeStraight Cutaway
WES696-10-1375-SCA-TFShips in 3 WeeksM10x135 mmTri-FlatStraight Cutaway
WES696-10-1375-SENShips in 3 WeeksM10x135 mmRoundSlotted External ThreadNylon
WES696-10-1375-SEN-QCShips in 3 WeeksM10x135 mmQuick ChangeSlotted External ThreadNylon
WES696-10-1375-SEN-TFShips in 3 WeeksM10x135 mmTri-FlatSlotted External ThreadNylon
WES696-10-1375-SESShips in 3 WeeksM10x135 mmRoundSlotted External ThreadSteel
WES696-10-1375-SES-QCShips in 3 WeeksM10x135 mmQuick ChangeSlotted External ThreadSteel
WES696-10-1375-SES-TFShips in 3 WeeksM10x135 mmTri-FlatSlotted External ThreadSteel
WES696-10-1375-SLShips in 5 WeeksM10x135 mmRoundSlotted
WES696-10-1375-SL-QCShips in 5 WeeksM10x135 mmQuick ChangeSlotted
WES696-10-1375-SL-TFShips in 5 WeeksM10x135 mmTri-FlatSlotted
WES696-10-1375-TFShips in 3 WeeksM10x135 mmTri-FlatStraight
WES696-10-1500-EN-TFShips in 3 WeeksM10x138 mmTri-FlatExternal ThreadNylon
WES696-10-1500-ES-TFShips in 3 WeeksM10x138 mmTri-FlatExternal ThreadSteel
WES696-10-1500-S2L-TFShips in 3 WeeksM10x138 mmTri-Flat2-Leg
WES696-10-1500-S3L-TFShips in 3 WeeksM10x138 mmTri-Flat3-Leg
WES696-10-1500-SCA-TFShips in 3 WeeksM10x138 mmTri-FlatStraight Cutaway
WES696-10-1500-SEN-TFShips in 3 WeeksM10x138 mmTri-FlatSlotted External ThreadNylon
WES696-10-1500-SES-TFShips in 3 WeeksM10x138 mmTri-FlatSlotted External ThreadSteel
WES696-10-1500-SL-TFShips in 5 WeeksM10x138 mmTri-FlatSlotted
WES696-10-1500-TFShips in 3 WeeksM10x138 mmTri-FlatStraight
WES696-10-2000-EN-TFShips in 4 WeeksM10x150.8 mmTri-FlatExternal ThreadNylon
WES696-10-2000-ES-TFShips in 4 WeeksM10x150.8 mmTri-FlatExternal ThreadSteel
WES696-10-2000-S2L-TFShips in 4 WeeksM10x150.8 mmTri-Flat2-Leg
WES696-10-2000-S3L-TFShips in 4 WeeksM10x150.8 mmTri-Flat3-Leg
WES696-10-2000-SCA-TFShips in 4 WeeksM10x150.8 mmTri-FlatStraight Cutaway
WES696-10-2000-SEN-TFShips in 4 WeeksM10x150.8 mmTri-FlatSlotted External ThreadNylon
WES696-10-2000-SES-TFShips in 4 WeeksM10x150.8 mmTri-FlatSlotted External ThreadSteel
WES696-10-2000-SL-TFShips in 6 WeeksM10x150.8 mmTri-FlatSlotted
WES696-10-2000-TFShips in 4 WeeksM10x150.8 mmTri-FlatStraight
WES696-10-875Ships in 3 WeeksM10x122 mmRoundStraight
WES696-10-875-ENShips in 3 WeeksM10x122 mmRoundExternal ThreadNylon
WES696-10-875-EN-QCShips in 3 WeeksM10x122 mmQuick ChangeExternal ThreadNylon
WES696-10-875-EN-TFShips in 3 WeeksM10x122 mmTri-FlatExternal ThreadNylon
WES696-10-875-ESShips in 3 WeeksM10x122 mmRoundExternal ThreadSteel
WES696-10-875-ES-QCShips in 3 WeeksM10x122 mmQuick ChangeExternal ThreadSteel
WES696-10-875-ES-TFShips in 3 WeeksM10x122 mmTri-FlatExternal ThreadSteel
WES696-10-875-QCShips in 3 WeeksM10x122 mmQuick ChangeStraight
WES696-10-875-S2LShips in 3 WeeksM10x122 mmRound2-Leg
WES696-10-875-S2L-QCShips in 3 WeeksM10x122 mmQuick Change2-Leg
WES696-10-875-S2L-TFShips in 3 WeeksM10x122 mmTri-Flat2-Leg
WES696-10-875-S3LShips in 3 WeeksM10x122 mmRound3-Leg
WES696-10-875-S3L-QCShips in 3 WeeksM10x122 mmQuick Change3-Leg
WES696-10-875-S3L-TFShips in 3 WeeksM10x122 mmTri-Flat3-Leg
WES696-10-875-SCAShips in 3 WeeksM10x122 mmRoundStraight Cutaway
WES696-10-875-SCA-QCShips in 3 WeeksM10x122 mmQuick ChangeStraight Cutaway
WES696-10-875-SCA-TFShips in 3 WeeksM10x122 mmTri-FlatStraight Cutaway
WES696-10-875-SENShips in 3 WeeksM10x122 mmRoundSlotted External ThreadNylon
WES696-10-875-SEN-QCShips in 3 WeeksM10x122 mmQuick ChangeSlotted External ThreadNylon
WES696-10-875-SEN-TFShips in 3 WeeksM10x122 mmTri-FlatSlotted External ThreadNylon
WES696-10-875-SESShips in 3 WeeksM10x122 mmRoundSlotted External ThreadSteel
WES696-10-875-SES-QCShips in 3 WeeksM10x122 mmQuick ChangeSlotted External ThreadSteel
WES696-10-875-SES-TFShips in 3 WeeksM10x122 mmTri-FlatSlotted External ThreadSteel
WES696-10-875-SLShips in 5 WeeksM10x122 mmRoundSlotted
WES696-10-875-SL-QCShips in 5 WeeksM10x122 mmQuick ChangeSlotted
WES696-10-875-SL-TFShips in 5 WeeksM10x122 mmTri-FlatSlotted
WES696-10-875-TFShips in 3 WeeksM10x122 mmTri-FlatStraight
WES696-8-1000Ships in 3 WeeksM8x125 mmRoundStraight
WES696-8-1000-ENShips in 3 WeeksM8x125 mmRoundExternal ThreadNylon
WES696-8-1000-EN-QCShips in 3 WeeksM8x125 mmQuick ChangeExternal ThreadNylon
WES696-8-1000-EN-TFShips in 3 WeeksM8x125 mmTri-FlatExternal ThreadNylon
WES696-8-1000-ESShips in 3 WeeksM8x125 mmRoundExternal ThreadSteel
WES696-8-1000-ES-QCShips in 3 WeeksM8x125 mmQuick ChangeExternal ThreadSteel
WES696-8-1000-ES-TFShips in 3 WeeksM8x125 mmTri-FlatExternal ThreadSteel
WES696-8-1000-QCShips in 3 WeeksM8x125 mmQuick ChangeStraight
WES696-8-1000-S2LShips in 3 WeeksM8x125 mmRound2-Leg
WES696-8-1000-S2L-QCShips in 3 WeeksM8x125 mmQuick Change2-Leg
WES696-8-1000-S2L-TFShips in 3 WeeksM8x125 mmTri-Flat2-Leg
WES696-8-1000-S3LShips in 3 WeeksM8x125 mmRound3-Leg
WES696-8-1000-S3L-QCShips in 3 WeeksM8x125 mmQuick Change3-Leg
WES696-8-1000-S3L-TFShips in 3 WeeksM8x125 mmTri-Flat3-Leg
WES696-8-1000-SCAShips in 3 WeeksM8x125 mmRoundStraight Cutaway
WES696-8-1000-SCA-QCShips in 3 WeeksM8x125 mmQuick ChangeStraight Cutaway
WES696-8-1000-SCA-TFShips in 3 WeeksM8x125 mmTri-FlatStraight Cutaway
WES696-8-1000-SENShips in 3 WeeksM8x125 mmRoundSlotted External ThreadNylon
WES696-8-1000-SEN-QCShips in 3 WeeksM8x125 mmQuick ChangeSlotted External ThreadNylon
WES696-8-1000-SEN-TFShips in 3 WeeksM8x125 mmTri-FlatSlotted External ThreadNylon
WES696-8-1000-SESShips in 3 WeeksM8x125 mmRoundSlotted External ThreadSteel
WES696-8-1000-SES-QCShips in 3 WeeksM8x125 mmQuick ChangeSlotted External ThreadSteel
WES696-8-1000-SES-TFShips in 3 WeeksM8x125 mmTri-FlatSlotted External ThreadSteel
WES696-8-1000-SLShips in 5 WeeksM8x125 mmRoundSlotted
WES696-8-1000-SL-QCShips in 5 WeeksM8x125 mmQuick ChangeSlotted
WES696-8-1000-SL-TFShips in 5 WeeksM8x125 mmTri-FlatSlotted
WES696-8-1000-TFShips in 3 WeeksM8x125 mmTri-FlatStraight
WES696-8-1250Ships in 3 WeeksM8x132 mmRoundStraight
WES696-8-1250-ENShips in 3 WeeksM8x132 mmRoundExternal ThreadNylon
WES696-8-1250-EN-QCShips in 3 WeeksM8x132 mmQuick ChangeExternal ThreadNylon
WES696-8-1250-EN-TFShips in 3 WeeksM8x132 mmTri-FlatExternal ThreadNylon
WES696-8-1250-ESShips in 3 WeeksM8x132 mmRoundExternal ThreadSteel
WES696-8-1250-ES-QCShips in 3 WeeksM8x132 mmQuick ChangeExternal ThreadSteel
WES696-8-1250-ES-TFShips in 3 WeeksM8x132 mmTri-FlatExternal ThreadSteel
WES696-8-1250-QCShips in 3 WeeksM8x132 mmQuick ChangeStraight
WES696-8-1250-S2LShips in 3 WeeksM8x132 mmRound2-Leg
WES696-8-1250-S2L-QCShips in 3 WeeksM8x132 mmQuick Change2-Leg
WES696-8-1250-S2L-TFShips in 3 WeeksM8x132 mmTri-Flat2-Leg
WES696-8-1250-S3LShips in 3 WeeksM8x132 mmRound3-Leg
WES696-8-1250-S3L-QCShips in 3 WeeksM8x132 mmQuick Change3-Leg
WES696-8-1250-S3L-TFShips in 3 WeeksM8x132 mmTri-Flat3-Leg
WES696-8-1250-SCAShips in 3 WeeksM8x132 mmRoundStraight Cutaway
WES696-8-1250-SCA-QCShips in 3 WeeksM8x132 mmQuick ChangeStraight Cutaway
WES696-8-1250-SCA-TFShips in 3 WeeksM8x132 mmTri-FlatStraight Cutaway
WES696-8-1250-SENShips in 3 WeeksM8x132 mmRoundSlotted External ThreadNylon
WES696-8-1250-SEN-QCShips in 3 WeeksM8x132 mmQuick ChangeSlotted External ThreadNylon
WES696-8-1250-SEN-TFShips in 3 WeeksM8x132 mmTri-FlatSlotted External ThreadNylon
WES696-8-1250-SESShips in 3 WeeksM8x132 mmRoundSlotted External ThreadSteel
WES696-8-1250-SES-QCShips in 3 WeeksM8x132 mmQuick ChangeSlotted External ThreadSteel
WES696-8-1250-SES-TFShips in 3 WeeksM8x132 mmTri-FlatSlotted External ThreadSteel
WES696-8-1250-SLShips in 5 WeeksM8x132 mmRoundSlotted
WES696-8-1250-SL-QCShips in 5 WeeksM8x132 mmQuick ChangeSlotted
WES696-8-1250-SL-TFShips in 5 WeeksM8x132 mmTri-FlatSlotted
WES696-8-1250-TFShips in 3 WeeksM8x132 mmTri-FlatStraight
WES696-8-1375Ships in 3 WeeksM8x135 mmRoundStraight
WES696-8-1375-ENShips in 3 WeeksM8x135 mmRoundExternal ThreadNylon
WES696-8-1375-EN-QCShips in 3 WeeksM8x135 mmQuick ChangeExternal ThreadNylon
WES696-8-1375-EN-TFShips in 3 WeeksM8x135 mmTri-FlatExternal ThreadNylon
WES696-8-1375-ESShips in 3 WeeksM8x135 mmRoundExternal ThreadSteel
WES696-8-1375-ES-QCShips in 3 WeeksM8x135 mmQuick ChangeExternal ThreadSteel
WES696-8-1375-ES-TFShips in 3 WeeksM8x135 mmTri-FlatExternal ThreadSteel
WES696-8-1375-QCShips in 3 WeeksM8x135 mmQuick ChangeStraight
WES696-8-1375-S2LShips in 3 WeeksM8x135 mmRound2-Leg
WES696-8-1375-S2L-QCShips in 3 WeeksM8x135 mmQuick Change2-Leg
WES696-8-1375-S2L-TFShips in 3 WeeksM8x135 mmTri-Flat2-Leg
WES696-8-1375-S3LShips in 3 WeeksM8x135 mmRound3-Leg
WES696-8-1375-S3L-QCShips in 3 WeeksM8x135 mmQuick Change3-Leg
WES696-8-1375-S3L-TFShips in 3 WeeksM8x135 mmTri-Flat3-Leg
WES696-8-1375-SCAShips in 3 WeeksM8x135 mmRoundStraight Cutaway
WES696-8-1375-SCA-QCShips in 3 WeeksM8x135 mmQuick ChangeStraight Cutaway
WES696-8-1375-SCA-TFShips in 3 WeeksM8x135 mmTri-FlatStraight Cutaway
WES696-8-1375-SENShips in 3 WeeksM8x135 mmRoundSlotted External ThreadNylon
WES696-8-1375-SEN-QCShips in 3 WeeksM8x135 mmQuick ChangeSlotted External ThreadNylon
WES696-8-1375-SEN-TFShips in 3 WeeksM8x135 mmTri-FlatSlotted External ThreadNylon
WES696-8-1375-SESShips in 3 WeeksM8x135 mmRoundSlotted External ThreadSteel
WES696-8-1375-SES-QCShips in 3 WeeksM8x135 mmQuick ChangeSlotted External ThreadSteel
WES696-8-1375-SES-TFShips in 3 WeeksM8x135 mmTri-FlatSlotted External ThreadSteel
WES696-8-1375-SLShips in 5 WeeksM8x135 mmRoundSlotted
WES696-8-1375-SL-QCShips in 5 WeeksM8x135 mmQuick ChangeSlotted
WES696-8-1375-SL-TFShips in 5 WeeksM8x135 mmTri-FlatSlotted
WES696-8-1375-TFShips in 3 WeeksM8x135 mmTri-FlatStraight
WES696-8-1500-EN-TFShips in 3 WeeksM8x138 mmTri-FlatExternal ThreadNylon
WES696-8-1500-ES-TFShips in 3 WeeksM8x138 mmTri-FlatExternal ThreadSteel
WES696-8-1500-S2L-TFShips in 3 WeeksM8x138 mmTri-Flat2-Leg
WES696-8-1500-S3L-TFShips in 3 WeeksM8x138 mmTri-Flat3-Leg
WES696-8-1500-SCA-TFShips in 3 WeeksM8x138 mmTri-FlatStraight Cutaway
WES696-8-1500-SEN-TFShips in 3 WeeksM8x138 mmTri-FlatSlotted External ThreadNylon
WES696-8-1500-SES-TFShips in 3 WeeksM8x138 mmTri-FlatSlotted External ThreadSteel
WES696-8-1500-SL-TFShips in 5 WeeksM8x138 mmTri-FlatSlotted
WES696-8-1500-TFShips in 3 WeeksM8x138 mmTri-FlatStraight
WES696-8-2000-EN-TFShips in 4 WeeksM8x150.8 mmTri-FlatExternal ThreadNylon
WES696-8-2000-ES-TFShips in 4 WeeksM8x150.8 mmTri-FlatExternal ThreadSteel
WES696-8-2000-S2L-TFShips in 4 WeeksM8x150.8 mmTri-Flat2-Leg
WES696-8-2000-S3L-TFShips in 4 WeeksM8x150.8 mmTri-Flat3-Leg
WES696-8-2000-SCA-TFShips in 4 WeeksM8x150.8 mmTri-FlatStraight Cutaway
WES696-8-2000-SEN-TFShips in 4 WeeksM8x150.8 mmTri-FlatSlotted External ThreadNylon
WES696-8-2000-SES-TFShips in 4 WeeksM8x150.8 mmTri-FlatSlotted External ThreadSteel
WES696-8-2000-SL-TFShips in 6 WeeksM8x150.8 mmTri-FlatSlotted
WES696-8-2000-TFShips in 4 WeeksM8x150.8 mmTri-FlatStraight
WES696-8-875Ships in 3 WeeksM8x122 mmRoundStraight
WES696-8-875-ENShips in 3 WeeksM8x122 mmRoundExternal ThreadNylon
WES696-8-875-EN-QCShips in 3 WeeksM8x122 mmQuick ChangeExternal ThreadNylon
WES696-8-875-EN-TFShips in 3 WeeksM8x122 mmTri-FlatExternal ThreadNylon
WES696-8-875-ESShips in 3 WeeksM8x122 mmRoundExternal ThreadSteel
WES696-8-875-ES-QCShips in 3 WeeksM8x122 mmQuick ChangeExternal ThreadSteel
WES696-8-875-ES-TFShips in 3 WeeksM8x122 mmTri-FlatExternal ThreadSteel
WES696-8-875-QCShips in 3 WeeksM8x122 mmQuick ChangeStraight
WES696-8-875-S2LShips in 3 WeeksM8x122 mmRound2-Leg
WES696-8-875-S2L-QCShips in 3 WeeksM8x122 mmQuick Change2-Leg
WES696-8-875-S2L-TFShips in 3 WeeksM8x122 mmTri-Flat2-Leg
WES696-8-875-S3LShips in 3 WeeksM8x122 mmRound3-Leg
WES696-8-875-S3L-QCShips in 3 WeeksM8x122 mmQuick Change3-Leg
WES696-8-875-S3L-TFShips in 3 WeeksM8x122 mmTri-Flat3-Leg
WES696-8-875-SCAShips in 3 WeeksM8x122 mmRoundStraight Cutaway
WES696-8-875-SCA-QCShips in 3 WeeksM8x122 mmQuick ChangeStraight Cutaway
WES696-8-875-SCA-TFShips in 3 WeeksM8x122 mmTri-FlatStraight Cutaway
WES696-8-875-SENShips Next Business DayM8x122 mmRoundSlotted External ThreadNylon
WES696-8-875-SEN-QCShips in 3 WeeksM8x122 mmQuick ChangeSlotted External ThreadNylon
WES696-8-875-SEN-TFShips in 3 WeeksM8x122 mmTri-FlatSlotted External ThreadNylon
WES696-8-875-SESShips in 3 WeeksM8x122 mmRoundSlotted External ThreadSteel
WES696-8-875-SES-QCShips in 3 WeeksM8x122 mmQuick ChangeSlotted External ThreadSteel
WES696-8-875-SES-TFShips in 3 WeeksM8x122 mmTri-FlatSlotted External ThreadSteel
WES696-8-875-SLShips in 5 WeeksM8x122 mmRoundSlotted
WES696-8-875-SL-QCShips in 5 WeeksM8x122 mmQuick ChangeSlotted
WES696-8-875-SL-TFShips in 5 WeeksM8x122 mmTri-FlatSlotted
WES696-8-875-TFShips in 3 WeeksM8x122 mmTri-FlatStraight

Switching from another manufacturer?

We’re here to help.

Our cross reference tool is the easiest way to find an equivalent or alternate part. If it’s not on our list, we’ll still be able to help you switch, perhaps even design a custom tool to your specification. Send us an email or give us call!

SAME DAY SHIPPING

Don't let delayed shipments hold up your assembly line.

We frequently restock our most popular items. Most of our standard microstops are in stock. All our online orders are fullfilled out of Houston, Texas facility and ships same day on in-stock orders placed before 12 PM CST.

Order online

Wescon USA
© Wescon Industries Inc. 2026601 Century Plaza Dr. Houston, TX 77073Our products are 100% designed and manufactured in our facilities in California and Texas.
Wescon USA